Bedok MRT Station
EW5 Bedok 勿洛 பிடோக் Bedok | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Rapid transit | |||||||||||
Platform A | |||||||||||
Location |
315 New Upper Changi Road Singapore 467347 | ||||||||||
Coordinates | 1°19′26.54″N 103°55′48.13″E / 1.3240389°N 103.9300361°E | ||||||||||
Operated by | SMRT Trains (SMRT Corporation) | ||||||||||
Line(s) | |||||||||||
Platforms | Island | ||||||||||
Tracks | 2 | ||||||||||
Connections | Bus, Taxi | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Platform levels | 2 | ||||||||||
Bicycle facilities | Yes | ||||||||||
Disabled access | Yes | ||||||||||
Other information | |||||||||||
Station code | EW5 | ||||||||||
History | |||||||||||
Opened | 4 November 1989 | ||||||||||
Previous names | Chai Chee | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
|
Bedok MRT Station (EW5) is an above-ground Mass Rapid Transit station on the East West Line in Bedok, Singapore. This station is one of the most widely used stations in eastern Singapore, being crowded at most times of the day.
Location
Bedok MRT Station is one of two stations on the eastern side of the East West Line that lies directly in the middle of a road. It is in the centre of New Upper Changi Road, separating the dual carriageway road in the middle. Underpasses connect the station to both sides of the road (as opposed to overhead bridges on the western part). It also links to Basement 2 of the newly opened Bedok Mall and the Bedok Bus Interchange. Together with the station itself, they make up the Bedok Integrated Transport Hub (ITH).
History
Like many above-ground MRT stations, the station was initially built without platform screen doors to prevent passengers from falling off the platform and onto the train tracks. Installation of platform screen doors started on 4 November 2010 and started operations on 11 January 2011 along with Paya Lebar as a safety precaution.
High volume, low speed (HVLS) fans
Installations of the Rite Hite Revolution High Volume, Low Speed (HVLS) fans were completed and subsequently began operations since 26 June 2012.
Station layout
L2 | Platform A | East West Line towards EW1 Pasir Ris via EW4 Tanah Merah (→) |
Island platform, doors will open on the right | ||
Platform B | East West Line towards EW29 Joo Koon via EW6 Kembangan (←) | |
L1 | EWL Concourse | Faregates, Ticketing Machines, Station Control, Underpass Entrance, Bedok Bus Interchange |
B1 | Underpass | Station Entrance, Underpass to cross New Upper Changi Road, Entrance to Bedok Mall Basement 2 |
Exits
- A: New Upper Changi Road (Westbound)
- B: New Upper Changi Road (Eastbound), Bedok Mall (Level 1), Kampong Chai Chee, Bedok Bus Interchange, Bedok Point, Bedok Town Centre
- C: Bedok Mall (Basement 2)
Transport connections
Rail
Destination | First Train | Last Train | ||||
---|---|---|---|---|---|---|
Mon – Sat | Sunday & Public Holiday | Daily | ||||
East West Line | ||||||
to EW1 Pasir Ris | 6.18am | 6.46am | 12.29am | |||
to EW29 Joo Koon | 5.39am | 6.05am | 11.34pm |
References
External links
Wikimedia Commons has media related to Bedok MRT Station. |
Wikiquote has quotations related to: Bedok MRT Station |