Second Avenue Subway

"IND Second Avenue Line" redirects here. For the former elevated railway line, see IRT Second Avenue Line. For the M15 bus on Second Avenue, see Second Avenue Line (surface).

Second Avenue Subway

Far top: The emblems of the Q and T trains, which are planned to serve the Second Avenue subway line.
Near top: The proposed connections of the Q, which will serve the first phase of the Second Avenue Subway. Phase I will offer Q service between Coney Island and 96th Street.
Main panel (bottom): Map of the T, which is planned to eventually serve the full line between 125th Street and Hanover Square, and the Manhattan portion of the Q, which will serve the line above 72nd Street.
Overview
Type Rapid transit
System New York City Subway
Status Phase I under construction, Phase II planned
Locale Manhattan, New York City, United States
Termini 125th Street
Hanover Square
Stations 16
Operation
Opened First phase: December 31, 2016 (2016-12-31) (projected)[1]
Owner City of New York
Operator(s) New York City Transit Authority / MTA Capital Construction
Technical
Line length 8.5 mi (13.7 km)
Number of tracks 2
Track gauge 4 ft 8 12 in (1,435 mm)
Electrification 600 V DC third rail

The Second Avenue Subway (officially the IND Second Avenue Line; abbreviated to SAS) is a future New York City Subway line that has been under discussion for almost a century. The line will run primarily under Second Avenue on the East Side of Manhattan. A first phase of this new line is expected to open on December 31, 2016, having been under construction since 2007. It will run between 96th Street and Second Avenue and the existing 63rd Street Lines, where it will connect to the BMT Broadway Line and the rest of the subway system. The Q train will provide full-time service on phase one and will serve about 200,000 daily riders on the new extension, supplemented by some rush-hour N trains that are making short turns at 96th Street. The full line, if and when funded, will be built in three additional phases, allowing portions to open before the entire line is completed. Upon completion, it would be served by a proposed T train and is projected to serve about 560,000 daily riders. The complete Second Avenue line, as proposed, would consist of 16 stations, 8.5 miles (13.7 km) of tunnel, and cost more than $17 billion.

The line was originally proposed in 1919 as part of a massive expansion of what would become the Independent Subway System (IND). Work on the line never commenced, as the Great Depression crushed the economy. Numerous plans for the Second Avenue Subway appeared throughout the 20th century, but these were usually deferred due to lack of funds. In anticipation of the never-built new subway line, the Second and Third Avenue elevated lines were demolished in 1942 and 1955, respectively. This left the Lexington Avenue Subway as the only rapid transit line on much of Manhattan's east side; today, it is by far the busiest subway line in the United States, with an estimated 1.3 million daily riders.

Construction on the Second Avenue line started in 1972, but was halted in 1975 because of the city's major fiscal crisis; only a few short segments of the line were completed at the time. Simultaneously, construction work on the 63rd Street Lines, which would connect the Second Avenue Line and the IND Queens Boulevard Line to the BMT Broadway Line and the IND Sixth Avenue Line, started in 1969. Work on the 63rd Street Lines continued even after construction on the Second Avenue line ended. The first segment of the 63rd Street Lines—which opened in October 1989 and extended to 21st Street–Queensbridge in Long Island City, Queens—left provisions for future connection to the Second Avenue Line.

Work on the line restarted in 2007 following the development of a financially secure construction plan. The Metropolitan Transportation Authority (MTA) awarded a tunneling contract for the first phase of the project to the consortium of Schiavone/Shea/Skanska (S3) on March 20, 2007. This followed preliminary engineering and a final tunnel design completed by a joint venture between AECOM and Arup. Parsons Brinckerhoff is serving as the Construction Manager of the project. A full funding grant agreement with the Federal Transit Administration for the first phase of the project was received in November 2007. A ceremonial ground-breaking for the Second Avenue Subway was held on April 12, 2007. The first phase of the line consists of three new stations and two miles (3.2 km) of tunnel, costing $4.45 billion. The contractor prepared the initial construction site at 96th Street on April 23, 2007. The tunnel boring machine launch box was completed in May 2010, and on May 14, MTA's contractors completed the TBM installation and turned it on. On March 28, 2011, S3, having completed the west tunnel to 65th Street, began drilling for the east tunnel, which completed its run to the Lexington Avenue–63rd Street station's bellmouth on September 22, 2011. As of November 2016, the first phase was 98% complete.

Initial attempts

Second Avenue Subway
Legend
Yard tracks & provision for future expansion to the Bronx
IRT Lexington Avenue Line
125th Street (proposed)
IRT Lexington Avenue Line
116th Street (proposed)
106th Street (proposed)
Line end for Phase 1
96th Street (under construction)
86th Street (under construction)
72nd Street (under construction)
63rd Street Lines
BMT Broadway Line
55th Street (proposed)
Lexington Avenue – 53rd Street   IND Queens Boulevard Line
42nd Street (proposed)
Grand Central – 42nd Street IRT Flushing Line
34th Street (proposed)
23rd Street (proposed)
14th Street (proposed)
Third Avenue BMT Canarsie Line
Houston Street
(proposed) 
Second Avenue
IND Sixth Avenue Line
BMT Nassau Street Line
Grand Street (proposed)
Chatham Square (proposed)
Seaport (proposed)
IND Eighth Avenue Line
Hanover Square (proposed)
provision for future expansion to Brooklyn

From 1919 through the 1980s, several different entities came up with many distinct plans for the Second Avenue subway line that were never carried out. The complex reasons for these delays are why the line is sometimes called "The Line That Time Forgot".[2][3]

1919–1941: Initial planning

After World War I, the New York City Subway experienced a surge in ridership. By 1920, 1.3 billion annual passengers were riding the subway, compared to 523 million annual riders just seven years before the war.[4] In 1919, the New York Public Service Commission launched a study at the behest of engineer Daniel L. Turner to determine what improvements were needed in the city's public transport system.[4] Turner's final paper, titled Proposed Comprehensive Rapid Transit System, was a massive plan calling for new routes under almost every north-south Manhattan avenue, extensions to lines in Brooklyn and Queens, and several crossings of the Narrows to Staten Island. Massively scaled-down versions of some of Turner's plans were found in proposals for the new city-owned Independent Subway System (IND).[5] Among the plans was a massive trunk line under Second Avenue consisting of at least six tracks and numerous branches throughout Brooklyn, Queens, and the Bronx.[6] Turner also proposed that the two elevated lines be knocked down to make room for the 6-track Second Avenue Subway.[7]:203 The plan was to connect the new line to the then-unbuilt Sixth Avenue and Eighth Avenue subway lines.[4]

In January 1927, Turner submitted a revised proposal. It was now going to connect to a Tenth Avenue trunk line as well as to crosstown lines in the Bronx and Queens.[4] The Second Avenue Subway was still a six-track line through Manhattan, except for a short eight-track tunnel at its junction with the Queens lines. The plan called for a connection to the IND Concourse Line in the Bronx, as well as another one to the IND Fulton Street Line in Brooklyn. Such a plan would have cost $165,000,000 (equivalent to $2,252,000,000 in 2015), including connections and underwater crossings.[4] As the IRT Lexington Avenue Line got more crowded, some suggested ideas that were considered unusual. One suggestion included a new tunnel under Lexington Avenue, while another included a tunnel under a separate right-of-way between Second and Third Avenue.[4]

A 1939 plan for expansion; the Second Avenue Subway is depicted as a red line going from southeast Bronx into Manhattan, and Brooklyn, where it connects to the Fulton St Line.

In 1929, the Board of Transportation of the City of New York tentatively approved the expansion, which included a Second Avenue Line with a projected construction cost of $98,900,000 (equivalent to $1,353,000,000 in 2015), not counting land acquisition.[8] From north to south, the 1929 plan included four tracks from the Harlem River (where it would continue north as a Bronx trunk line with several branches) to 125th Street, six tracks from 125th Street to a link with the Sixth Avenue Line at 61st Street, four tracks from 61st Street to Chambers Street, and two tracks from Chambers Street to Pine Street.[9] The plan was soon modified with the addition of another Bronx branch, as well as an extension of the subway to Water and Wall Streets.[6][7]:203 At the time, it was supposed to be completed between 1938 and 1941.[8] In anticipation of the line's opening, real estate prices along the proposed route rose by an average of 50%.[10]

Due to the Great Depression, the soaring costs of the expansion became unmanageable. Construction on the first phase of the IND was already behind schedule, and the city and state were no longer able to provide funding.[6] By 1930, the line was shortened to between 125th and 34th Streets, with a turnoff at 34th Street and a crosstown connection there; this line was to be complete by 1948.[4][8] The line above 32nd Street was to start construction in 1931, with construction of a southern extension to Houston Street to commence in 1935; these segments would open in 1937 and 1940, respectively.[4] This scaled-down plan was postponed in 1931.[6] By 1932, the Board of Transportation had come up with another plan, which omitted a branch in the Bronx in order to cut costs.[7]:204–205 The new line's southern terminus would be truncated to the Nassau Street Loop.[4]

Further revision of the plan and more studies followed. By 1939, construction had been postponed indefinitely, and Second Avenue line was relegated to "proposed" status, and was number 14 on the Board of Transportation's list of important transportation projects.[4][6] The Second Avenue line was also cut to two tracks, but now had a connection to the BMT Broadway Line. The reduced plan now had a single northern branch through Throggs Neck, Bronx, and a branch south into Brooklyn, connecting to a stub of the IND Fulton Street Line at the Court Street station, which is now the site of the New York Transit Museum.[6][7]:205 The subway was now also US$249 million (equivalent to $4,013,000,000 in 2015).[8] The United States' entry into World War II in 1941 halted all but the most urgent public works projects, delaying the Second Avenue Line once again.[6][8]

1940s–1950s: After World War II

The Second Avenue El, looking south on First Avenue from 13th Street during its demolition in September 1942

As part of the unification of the three subway companies that comprised the New York City Subway, elevated lines were being shut down all over the city and replaced by subways, continuing the IND's trend of phasing out elevated lines and streetcars in favor of new subways. For example, the IND Sixth Avenue Line replaced the Sixth Avenue Elevated, while the IND Fulton Street Line replaced the Fulton Street Elevated. Demolition of the elevateds also had the perceived effect of revitalizing the neighborhoods.[7]:205–206 The northern half of the Second Avenue Elevated, serving the Upper East Side and East Harlem closed in 1940; the southern half, running through Lower Manhattan, East Midtown and across the Queensborough Bridge to Queens, closed on June 13, 1942.[11] The demolition of the Second Avenue elevated caused overcrowding on the Astoria and Flushing Lines in Queens, which no longer had direct service along Manhattan's far East Side.[7]:208 Because of the elevated line's closure, as well as a corresponding increase in the East Side population, the need for a Second Avenue subway increased.[12]

In 1944, Mayor Fiorello H. La Guardia announced that work on the Second Avenue subway line was progressing.[7]:209 The same year, BOT superintendent Philip E. Pheifer came up with a map of train frequencies for the line, with about 56 trains per hour projected to go through the Second Avenue line. Pheifer also put forth a proposal for Second Avenue Subway services, which would branch extensively off to B Division lines, including the IND Sixth Avenue Line, BMT Broadway Line, and BMT Nassau Street Line, via pre-existing BMT trackage over the Manhattan and Williamsburg Bridges.[4][7]:209–210 From Canal Street to 57th Street the line was to be four tracks, with six tracks north of 57th Street. South of Canal Street there would be two tracks.[9][13] The subway was to be opened by 1951.[8] In addition, a new Bronx Branch would replace the Third Avenue El in the Bronx.[4] By 1945, though, plans for the Second Avenue Subway were again revised. The southern two-track portion was abandoned as a possible future plan for connecting the line to Brooklyn, through a Bronx route to Throggs Neck was put forth.[6][7]:210–211

Under Mayor William O'Dwyer and General Charles P. Gross, another plan was put forth in 1947 by Colonel Sidney H. Bingham, a city planner and former Interborough Rapid Transit Company (IRT) engineer. O'Dwyer and Gross believed that construction of a Second Avenue subway line would be vital to both increasing capacity on existing lines and allowing new branch lines to be built.[4][7]:209 This plan would again connect the Second Avenue Line to Brooklyn. As with Pheifer's proposal, a train frequency map was created; however, Bingham's proposal involved more branch lines and track connections. A connection to Brooklyn was to be made via the Manhattan and Williamsburg Bridge, and would allow trains from these bridges to go onto the Sixth Avenue Line or the Second Avenue Line. Other connections to the Second Avenue Line were to be provided at 57th Street, via a line connecting to the Sixth Avenue Line; two express tracks would be built along that line north of West Fourth Street. The IRT Pelham Line would be switched to the combined IND/BMT division (this plan also includes other connections, which have been built), and connected to the Second Avenue Line. The Second Avenue Line would end just north of that connection, at 149th Street, with transfers to the IRT White Plains Road Line and the elevated IRT Third Avenue Line, the latter of which would be demolished south of 149th Street.[4][7]:209[14] There would also be a connection to the IND Concourse Line.[4] The line was to be built in sections. The Manhattan section was top-priority, but the Brooklyn section was 19th on the priority list, and the Bronx section did not have a specific priority.[7]:209

By the next year, New York City had budget shortfalls. The City was short of $145 million (in 1948 dollars) that were needed for rehabilitation and proposed capital improvements, which cost a total of $800 million. The City petitioned the New York State Legislature to exceed its $655 million debt ceiling so that the city could spend $500 million on subway construction, but this request was denied.[4]

A R11 car, coupled to a R16 car. Ten R11s were built for the Second Avenue Subway.

The New York Board of Transportation ordered ten new prototype subway cars made of stainless steel from the Budd Company. These R11 cars, so called because of their contract number, were delivered in 1949 and specifically intended for the Second Avenue Subway. They cost US$100,000 (equivalent to $1,000,000 in 2015) each; the train became known as the "million dollar train".[15][16] The cars featured porthole style round windows and a new public address system. Reflecting public health concerns of the day, especially regarding polio, the R11 cars were equipped with electrostatic air filters and ultraviolet lamps in their ventilation systems to kill germs.[15][16]

By 1949, Queens and Lower Manhattan residents complained that the Second Avenue Subway would not create better transit options for them.[4] A year later, revised plans called for a connection from Second Avenue at 76th Street to Queens, under 34th Avenue and Northern Boulevard, via a new tunnel under the East River. Connections would also be made to the Long Island Rail Road (LIRR)'s Rockaway Beach Branch.[4][14][note 1] New York voters approved a bond measure for its construction in 1951, and the city was barely able to raise the requisite $559 million for the construction effort. However, the onset of the Korean War caused soaring prices for construction materials and saw the beginning of massive inflation.[4][8] Money from the 1951 bond measure was diverted to buy new cars, lengthen platforms, and maintain other parts of the aging New York City Subway system.[14] Out of a half-billion-dollar bond measure, only $112 million (equivalent to $1,023,000,000 in 2015), or 22% of the original amount, went toward the Second Avenue Subway.[4][8] By then, construction was due to start by either 1952 or 1957, with estimated completion by 1958 at the earliest.[8] Because many people thought that the bonds were solely to be used on the new subway, many people accused the New York City Transit Authority (NYCTA) of misusing the bonds.[4]

A block to the west of the proposed subway line, the Manhattan section of the Third Avenue Elevated, the only other elevated line in the area, closed on May 13, 1955,[18] and was demolished in 1956.[11] Contrary to what many East Side residents thought, the demolition of the elevateds did not help the travel situation, as the Lexington Avenue Line was now the only subway transportation option on the East Side.[4]

By 1957, it had been made clear that the 1951 bond issue was not going to be able to pay for the Second Avenue Line. The money had been used for other projects, such as the integration of the IRT Dyre Avenue Line, and IND Rockaway Line, and reconfiguration of the DeKalb Avenue Interlocking.[7]:216 By then, the New York Times despaired of the line's ever being built.[8] In March of that year, NYCTA chairman Charles L. Patterson stated that the NYCTA had used the bond funds properly and that the bonds were not dedicated solely to fund the Second Avenue Line. He stated that the bonds had been allocated to the corridor based on increasing ridership on the Second Avenue Line, but admitted that currency inflation, as well as necessary rehabilitation work to the existing lines, made the Second Avenue Line unlikely in the near future.[4]

1960s–1970s: Original construction efforts

The Grand Street station, built as part of the Chrystie Street Connection, was originally conceived with a possible cross-platform interchange with the Second Avenue Subway.

As the early 1960s progressed, the East Side experienced an increase in development, and the Lexington Avenue Line became overcrowded.[4] In 1962, construction began on a connection between the Manhattan and Williamsburg Bridges and the Sixth Avenue Line. This segment, the Chrystie Street Connection, was first proposed in the 1947 plan as the southern end of the Second Avenue line, which would feed into the two bridges. When opened in 1967, the connection included a new station on the Sixth Avenue Line—Grand Street (another station, 57th Street, opened in July 1968)—and introduced the most significant service changes ever carried out in the subway's history.[7]:216–217 Grand Street, located under Chrystie Street (the southern end of Second Avenue) was designed to include cross-platform transfers between the Sixth Avenue and Second Avenue Lines.[7][19][20][21] Although the connection only served Sixth Avenue Line trains, it was essentially the first part of the Second Avenue line constructed.

In 1964, Congress passed the Urban Mass Transportation Act, promising federal money to fund mass transit projects in America's cities via the Urban Mass Transportation Administration (UMTA).[4][22] Three years later, voters approved a $2.5 billion (worth about $17,772,000,000 in current dollars) Transportation Bond Issue, which provided over $600 million (worth $4,265,000,000 today) for New York City projects, including for a 1968 Program for Action.[4][23] The Second Avenue project, for a line from 34th Street to the Bronx, was given top priority.[8] The City secured a $25 million UMTA grant for initial construction.[7]:219[8]

The Program for Action proposed a Second Avenue line to be built in two phases: The first phase would start from 34th Street in Midtown, running up Second Avenue to 126th Street and continuing to the Bronx, with stops planned at Kips Bay (34th Street), United Nations (between 44th Street and 48th Street), Midtown East (57th Street), Yorkville (86th Street), Franklin Plaza (106th Street), and Triboro Plaza (125th Street).[9][24] The 48th Street stop would connect to a planned Metropolitan Transportation Center at Third Avenue and 48th Street, which would contain a new east side terminal for the Long Island Rail Road. The line included older proposals for connections to the Sixth Avenue and Broadway lines in Midtown via a new crosstown line, which would now be located on 63rd Street.[24] The BMT 63rd Street Line would also include a connection allowing Second Avenue line trains to run to Queens. In the Bronx, the line would run along East 138th Street, with a cross-platform transfer to Lexington Avenue Line trains at Brook Avenue on the IRT Pelham Line, which would be reconfigured. After that, Second Avenue line trains would use a new express bypass line along East 138th Street, and the former tracks of the New York, Westchester and Boston Railway (NY&WB) near the Bruckner Expressway.[24] In Hunts Point, service would split into two branches. One branch would continue to use former NY&WB trackage to East 180th Street, at which point the line would connect to the IRT Dyre Avenue Line. A second branch would connect to the IRT Pelham Line in the vicinity of Whitlock Avenue station, another element from earlier plans. The first branch would take over all service on the Dyre Avenue Line, offering cross-platform transfers to IRT White Plains Road Line trains at East 180th Street station, which would also be reconfigured. The second branch would take over service on the upper portion of the Pelham Line, between Whitlock Avenue and Pelham Bay Park. All stations on the Dyre Avenue and upper Pelham Lines would have platforms shaved back to accommodate larger B Division trains.[9][24]

The second phase of construction would extend the Second Avenue line south from 34th Street in Midtown to Lower Manhattan, with stations at 23rd Street, 14th Street, East Houston Street, Grand Street, Chatham Square, Pine/Wall Streets, and a terminal at Whitehall Street. The alignment for this portion of the line would have been via Second Avenue, Chrystie Street, Chatham Square, Saint James Place, and Water Street.[9] Free transfers would be offered to existing lines at 14th Street, East Houston Street and Whitehall Street, while Grand Street would be reconstructed.[24] Pine-Wall and Whitehall Street stations would both have four tracks (two platform levels with two tracks each) in order to increase the capacity of the Whitehall Street terminal above 30 trains per hour, and to improve passenger flow. Also during this phase, service on the upper Pelham Line would be extended to Co-op City, Bronx. A third branch of the Second Avenue line to replace the Third Avenue El in the Bronx would also be built, running adjacent to the right-of-way of Metro-North’s Harlem Line on Park Avenue.[24]

The line's planned stops in Manhattan, spaced farther apart than those on existing subway lines, proved controversial; the Second Avenue line was criticized as a "rich man's express, circumventing the Lower East Side with its complexes of high-rise low- and middle-income housing and slums in favor of a silk stocking route.”[7]:218 People protested for almost a year over the lack of stations at 72nd and 96th Streets; while a Lenox Hill (72nd Street) station[9] was added in October 1970, the 96th Street station was still not in the official plans, despite the proximity of the Metropolitan Hospital Center to the proposed station.[7]:220 In response to public outcry, the MTA announced the addition of a station at 96th Street in 1971.[25] The line’s planned route on Second Avenue, Chrystie Street and the Bowery in the Lower East Side also drew criticism from citizens and officials.[26] In January 1970, the MTA issued a plan for a spur line, called the "cuphandle", to serve the heart of the Lower East Side: branching off from the IND Sixth Avenue Line near the Second Avenue station, the spur would run east on Houston Street, turn north on Avenue C, and turn west on 14th Street, connecting to the BMT Canarsie Line.[26]

A combination of Federal and State funding was obtained, and despite the controversy over the number of stops and route, a groundbreaking ceremony was held on October 27, 1972 at Second Avenue and 103rd Street.[9][27][28] Construction began shortly thereafter on what was to be the 99th–105th Streets segment, which was projected to cost $17.48 million (worth about $99,053,000 today).[29] Construction costs for the entire line were pegged at $1 billion (about $5.667 billion today), and rose to $1.3 billion (about $6.941 billion today) a year later.[8] On October 25, 1973, the line's Chinatown segment commenced construction at Canal Street under the foot of the Manhattan Bridge; this segment, between Canal and Pell Streets, was due to be completed by 1980 and was being built at a cost of $8.3 million (equal to about $44,319,000 in current dollars).[29] Less than a year later, on July 25, 1974, construction for an East Village segment of the line started near Second Street, spanning between 2nd Street and 9th Street.[29] Another contract, for a Midtown segment between 50th and 54th Streets, was awarded that year, but construction never commenced.[30] In total, construction on the Second Avenue Line during the 1970s spanned over 27 blocks.[29] A segment between 110th and 120th Streets in East Harlem was also completed at a cost of $34.45 million (equivalent to $195,217,000 in 2015).[29] The city also changed zoning regulations for areas located near planned stations. New and existing buildings in these areas were required to build pedestrian plazas and arcades that would allow for the future construction of subway entrances.[7]:222

Tunnel segment from 99th to 105th Streets built in the 1970s. In 2013, it was outfitted with track and other infrastructure.

However, the city soon experienced its most dire fiscal crisis yet, due to the stagnant economy of the early 1970s, combined with the massive outflow of city residents to the suburbs.[28] By 1974, New York City mayor Abraham Beame was considering reallocating $5.1 billion of funding from the Second Avenue Line to the existing infrastructure, which was rapidly deteriorating and in dire need of repair.[31] In September 1975, Beame issued a stop-work order for the line.[32] Construction of the line was halted, and no other funding was to be allocated to the line's construction.[32] Besides the Chrystie Street Connection, only three sections of tunnel had been completed; these tunnels were sealed. By 1978, when the New York City Subway was at its lowest point in its existence, State Comptroller Arthur Levitt stated that there were no plans to finish the line.[8] During the 1980s, plans for the Second Avenue line stagnated. Construction on the 63rd Street Lines continued; the IND portion of the line opened in 1989, but it did not include a connection to the Second Avenue line. Of this failure to complete construction, Gene Russianoff, an advocate for subway riders since 1981, stated: "It's the most famous thing that's never been built in New York City, so everyone is skeptical and rightly so. It's much-promised and never delivered."[33]

Segments completed in the 1970s

When construction on the line was halted in 1975, three tunnel segments were completed: one from 99th to 105th Streets and a second from 110th to 120th Streets, both under Second Avenue in East Harlem, and a third from Pell to Canal Streets in Chinatown, under the Confucius Apartments complex next to the Bowery.[8][34][35] They were not initially outfitted with track or signals.[36] Over the next few decades, the MTA regularly inspected and maintained the tunnel segments (spending $20,000 a year by the early 1990s), to maintain the structural integrity of the streets above, and in case construction would ever resume. Trespassers would often camp in the tunnels until the MTA increased security.[37]

The modern construction plan for the Second Avenue Subway, developed in 2004,[38] would make use of most of these tunnel segments. The first phase of service, which will reroute Q train service from the 60th Street Line (to Queens) to the BMT 63rd Street Line (and north to 96th Street), would use the tunnel segment between 99th and 105th Streets for storage of up to four trainsets. By mid-2013, work had resumed in this tunnel segment, involving the addition of track and signals, mechanical and plumbing equipment, and upgrading the tunnels to meet modern fire code standards.[40][41] Phase 2, which does not have a set timetable for construction,[42][43] is planned to extend Q train service from 96th Street to 125th Street. During Phase 2, both East Harlem segments will be connected, modified, and used for normal train service. In 2007, the MTA reported that the segments were in pristine condition.[36]

The fourth phase of construction will bring the Second Avenue line through Chinatown at an undetermined date. However, the tunnel under the Confucius Apartments is not planned to be used; while original plans involved the Second Avenue line running at the same depth of the Sixth Avenue Line at the Grand Street station,[44][45][46][47][48] that option would require the utilization of cut-and-cover construction methods, which would disrupt the community and require the demolition of several nearby structures.[45][49] Instead the MTA has proposed a deeper tunnel alignment in this area, including a new lower level at Grand Street, to reduce construction impacts on the Chinatown community.[44][46][50] As a result, trains will be unable to use this tunnel segment; however, the MTA suggests that the tunnel segment could be used to store ancillary facilities for the subway line, such as a power substation or a ventilation facility.[19]

Some construction work also took place between 2nd and 9th Streets, though the extent is disputed. Some reports say that only utilities were relocated, while others say that this section was excavated but later filled back in.[35]

2000s–present: Construction and development

With the city's economic and budgetary recovery in the 1990s, there was a revival of efforts to complete construction of the SAS. Rising ridership on the IRT Lexington Avenue Line, the only subway trunk line east of Central Park, demonstrated the need for the Second Avenue Line, as capacity and safety concerns rose. The four-track IRT Lexington Avenue Line, the lone rapid transit option in the Upper East Side and East Harlem since the 1955 closure of the Third Avenue elevated, is the most crowded subway line in the country. The line sees an average of 1.3 million daily riders, more than the entire Washington Metro system (which has the second-highest ridership in the U.S.) and more than the rail transit systems of San Francisco and Boston combined.[51] Local bus routes are just as crowded during various times of the day, with the surface Second Avenue Line, carrying the M15 and M15 SBS buses, which see a combined annual ridership of 17.5 million or a daily ridership of about 47,945.[52] The construction of the Second Avenue line would add another two tracks to fill the gap that has existed since the elevated Second and Third Avenue Lines were demolished in the 1950s.[51]

1995–2007: Planning

In the early 1990s, New York governor Mario Cuomo allocated $22 million to renew planning and design efforts for the Second Avenue line, but in 1993 the MTA, facing budget cuts, removed these funds from its capital budget. In 1995, the MTA began its Manhattan East Side Alternatives (MESA) study, both a MIS and a DEIS, seeking ways to alleviate overcrowding on the Lexington Avenue Line and improve mobility on Manhattan's East Side. The study analyzed several alternatives, such as improvements to the Lexington Avenue Line to increase capacity, enhanced bus service with dedicated lanes, and light rail or ferry service on the East Side.[9]

The favored alternative, build alternative 1 included a subway running down Second Avenue, from 125th Street in Harlem to the existing Lexington Avenue–63rd Street station with provisions for expansion to the Bronx and to Lower Manhattan.[9] Second Avenue was chosen over Third Avenue, because Third Avenue was too close to the Lexington Avenue Line, and Second Avenue was chosen over First Avenue, because it would be too difficult to construct near the Queensboro Bridge, the United Nations and the Queens-Midtown Tunnel.[9]

Route proposals

The 1999 DEIS only proposed new subway service from 63rd Street north up Second Avenue to 125th Street via the Broadway Line to Lower Manhattan. All trains would have been routed down the Broadway Line express tracks, which are the only tracks on the Broadway Line which connect to the 63rd Street Line. In order to provide access to Lower Manhattan, and to allow for congestion reduction on the Lexington Avenue Line, the "Canal Flip" was proposed. The "Canal Flip" would have flipped the local and express tracks at Canal Street, having local trains run via the Manhattan Bridge, and in turn having the express trains continue south on the Broadway Line through Lower Manhattan and through the Montague Tunnel into Brooklyn. Once the construction of full-length Second Avenue Subway was approved, this option was discarded.[53]

Initially, a spur to Grand Central Terminal was considered, which would have run via 44th Street as a way to divert riders from the 4 5 routes, which run express on the Lexington Avenue Line. Service on this spur could not be as frequent as that on Lexington Avenue as there would not be enough capacity on Second Avenue, and as a result this plan was dropped.[54]

A picture of Hanover Square in Manhattan
Hanover Square (pictured) was finally decided as the location of the line's southern terminus.

South of 14th Street, there were two possible options to decide between. Option A would continue the subway beneath Chrystie Street, St. James Place and Water Street to a terminal in Lower Manhattan. Option B would connect the new subway to the existing Nassau Street Loop tracks J1 and J2 at Kenmare Street to provide access to Lower Manhattan.[55] This option has been proposed as part of plans for the Second Avenue Subway from the 1940s and 1950s. Cross-platform transfers would be available at Canal Street and Chambers Street to the Nassau Street Line routes. This option would allow Second Avenue trains to have access to Brooklyn using the under-utilized Montague Tunnel. This option would have a lower cost than the Water Street option as there would be less tunnel needed to be constructed. The Nassau option would attract more riders to the subway system because of additional service to Brooklyn, but the Water Street option would provide greater coverage in Manhattan and would be better at relieving congestion on the Lexington Avenue Line. Because the platforms on the BMT Eastern Division are shorter than the those on the rest of the B Division, those on the Nassau Street Line south of Chambers Street would have to be lengthened by about 120 feet (37 m), to a total of 615 feet (187 m). The tracks would have to be reconfigured, the passenger circulation capacity would have to be increased, and the service plan south of Chambers Street would have to be modified, to provide sufficient capacity to accommodate the additional trains that Second Avenue Subway service would require. The Nassau Street Line connection would have run through a new tunnel that first turns to the east to align under Forsyth Street before turning west and joining the Nassau Street Line along Kenmare Street.[53][54]

The Water Street option was chosen even though it would cost $360 million more because of the additional benefits it would provide. The Nassau Street option would have required the reorganization of the existing services on the Nassau Street Line, and passengers entering via the Williamsburg Bridge would not have direct service to destinations in other parts of Brooklyn. Additionally, over a period between two and three years long, service on the Nassau Street Line would have been required to be shut down during late nights and/or weekend hours. The Nassau Street option would not have the capacity for future Queens service via the 63rd Street Tunnel.[53]

Originally, the 125th Street station was to have been constructed parallel to the Lexington Avenue Line, curving below private property to join Second Avenue at 115th Street. This option was favored as it would have allowed an eventual extension of the Second Avenue Subway to the Bronx via the IRT Pelham Line, while still providing a transfer at 125th Street to the Lexington Avenue Line. This option would not have a station built at 116th Street, and because of requests by the local community, the SDEIS evaluated the inclusion of this station. The s-curve options were out of the question because of the large curve radius required for efficient and fast subway operation. As a result, the alignment at 125th Street was changed. Instead, the line would continue via Second Avenue until 125th Street, when it would then curve under a small number of private properties before heading west on 125th Street. A future extension to the Bronx would be allowed from Second Avenue as opposed to Lexington Avenue. This alignment also allows for the construction of a storage yard north of 125th Street.[53][54]

Build alternative two would involve the addition of a separate light rail service between Union Square and Broad Street that would serve the Lower East Side and Lower Manhattan.[11] Other alternatives including building in-fill stations on various lines (including the 63rd Street Line at First Avenue, at First Avenue on the Broadway Line, at First Avenue on the Flushing Line, and Avenue C on the Canarsie Line), building an elevated train line along Second or First Avenues, or lengthening the platforms on the Lexington Avenue Line to accommodate twelve-car trains.[9] Due in part to strong public support, the MTA Board committed in April 2000 to building a full-length subway line along the East Side, from East Harlem to Lower Manhattan.[56][57] In May 2000, the MTA Capital Program Review Board approved the MTA's 2000–2004 Capital Program, which allocated $1.05 billion for the construction of the Second Avenue Subway.[54] In 2001, a contract for subway design was awarded to DMJM Harris/Arup Joint Venture.[8] On December 19, 2001, the Federal Transit Administration approved the start of preliminary engineering on a full-length Second Avenue Subway

Approval and preparation for construction

In 2003, two million dollars in preliminary funding for the subway were provided by Congressmen Maurice Hinchey and John Sweeney.[58] The MTA's final environmental impact statement was approved in April 2004;[39] this latest proposal is for a two-track line from 125th Street and Lexington Avenue in Harlem, down Second Avenue to Hanover Square in the Financial District. The new subway line will actually carry two services. The full-length Second Avenue line, extending from Harlem to the Financial District, is to be given the color turquoise and the letter designation T.[59] However, a rerouted Q, the line's other service, will begin carrying passengers first. The MTA plan calls for building the Second Avenue Subway in four segments with connections to other subway lines. The first segment (Phase One) is a proposed reroute of the Q, the Broadway Express via the BMT 63rd Street Line and north along Second Avenue to the Upper East Side at 96th Street. Phase Two will extend the rerouted Q train to 125th Street and Lexington Avenue. In Phase Three, the new T train will run from 125th Street to Houston Street. The final phase will extend T train service from Houston Street to Hanover Square in Lower Manhattan.[60] In order to store the 330 additional subway cars needed for the operation of the line, the 36th–38th Street Yard would be reconfigured. In addition, to allow for train storage, alongside the main alignment, there would be storage tracks between 21st Street and 9th Street. The Second Avenue Subway would be chained as S.[9]

Track maps on the MTA's website show that all stations, except for 125th Street, will have two tracks and one island platform.[61][62] 72nd Street was conceived as a three-track, two-platform station, as is 125th Street. This would have allowed trains from the Broadway Line to reverse without interfering with service on Second Avenue. In addition, the third track would have provided additional operational flexibility that could be used for construction work and non-revenue moves.[53] However, to reduce costs, the 72nd Street station is being constructed with two tracks and one platform.[63][64][65]

In August 2006, the MTA revealed that all future subway stations, including ones built for the Second Avenue subway, the 7 Subway Extension, and the new South Ferry station will be outfitted with air-cooling systems to reduce the temperature along platforms by as much as 10 °F (6 °C).[66] The Second Avenue Subway was also to have platform screen doors to assist with air-cooling and ventilation, but this plan was scrapped in 2012 as cost-prohibitive.[67][68]

The 2-mile (3.2 km)[69] first phase will be within budget, at $4.45 billion.[69][70] Its construction site was designated as being from 105th Street and Second Avenue to 63rd Street and Third Avenue.[71] Deep bore tunneling methods were to be used in order to avoid the disruptions for road traffic, pedestrians, utilities and local businesses produced by cut-and-cover methods of past generations. Stations were to retain cut-and-cover construction.[72] The total cost of the 8.5-mile (13.7 km) line is expected to exceed $17 billion.[2] In 2014, MTA Capital Construction President Dr. Michael Horodniceanu stated that the whole line may be completed as early as 2029 (although this date has not been confirmed),[73] and would serve 560,000 daily passengers upon completion.[74] The line is described as the New York City Subway's "first major expansion" in more than a half-century.[75] However, its completion is in doubt, with one construction manager saying that the first phase of the project is "four and a half billion dollars for three stations." and that there are 15 stations that need to be built for the entire line.[70]

2007–present: First phase

Beginning of construction

The 72nd Street station cavern in January 2012

Second Avenue Subway plans for Phase 1 were only allowed to proceed because New York voters passed a transportation bond issue on November 8, 2005, allowing for dedicated funding allocated for that phase. Its passage had been seen as critical to its construction, but the bond was passed only by a narrow margin, with 55 percent of voters approving and 45 percent disapproving. After warning that failure to pass the act would doom the project, MTA chairman Peter S. Kalikow stated, "Now it's up to us to complete the job."[76] On December 18, 2006, the U.S. Department of Transportation announced that they would allow the MTA to commit up to $693 million in funds to begin construction of the Second Avenue Subway and that the federal share of such costs would be reimbursed with FTA transit funds, subject to appropriations and final labor certification.[77]

Preliminary engineering and a final tunnel design was completed by a joint venture between AECOM and Arup.[78][79][80] On March 20, 2007, upon completion of preliminary engineering, the MTA awarded a contract for constructing the tunnels between 92nd and 63rd Streets, a launch box for the tunnel boring machine (TBM) at 92nd to 95th Streets, and access shafts at 69th and 72nd Streets. This contract, valued at $337 million, was awarded to S3, a joint venture of Schiavone Construction, Skanska USA Civil, and J.F. Shea Construction.[81][82][83][84][85] A ceremonial groundbreaking took place on April 12, 2007, in a tunnel segment built in the 1970s at 99th Street.[86] At the time, it was announced that passengers would be able to ride trains on the new line by the end of 2013.[87] Actual construction work began, on the surface of Second Avenue between 91st and 95th Streets, on April 23, 2007. Initial construction work involved moving utility pipes, wires, and other infrastructure, which took 14 months, far more than the MTA's anticipated eight months. For boring, a trench was dug from 96th to 93rd Streets.[88]

In November 2007, Mary Peters, the United States Secretary of Transportation, announced that the Second Avenue Subway would receive $1.3 billion in federal funding for the project's first phase, to be funded over a seven-year period.[89] However, due to cost increases for construction materials and diesel fuel affecting the prices of contracts not yet signed, the MTA announced in June 2008 that certain features of the Second Avenue Subway would be simplified to save money. One set of changes, which significantly reduces the footprint of the subway in the vicinity of 72nd Street, is the alteration of the 72nd Street Station from a three-track, two-platform design to a two-track, single island platform design, paired with a simplification of the connection to the Broadway Line spur.[63][64] Supplemental environmental impact studies covering the changes for the proposed 72nd Street and 86th Street stations were completed in June 2009.[90][91][92]

Ceiling of the 86th Street station in December 2013

On May 28, 2009, the MTA awarded a $303.8 million contract to E.E. Cruz and Tully Construction Co., a joint venture and limited liability company, to construct the 96th Street station box.[93] Work began in July on site clearing and utility relocation necessary to prepare for the installation of slurry walls between 95th and 99th Streets where the station connects to the existing tunnel section. In June 2009, the first of three contracts for the 86th Street station was awarded for the advance utility relocation work and construction of cut and cover shaft areas at 83rd and 86th Streets. This contract provided two vertical starter shafts that were used by a subsequent contractor to excavate the station cavern in the rock between 83rd and 86th Streets.[94]

During construction, two buildings had to be evacuated in June 2009 due to construction work. On June 5, 2009, an apartment building at 1772 Second Avenue was evacuated by the NYC Department of Buildings (DOB) after it was determined that the building was in danger of collapse.[95] Then on June 29, 2009, the DOB evacuated a mixed use building at 1768 Second Avenue/301 East 92nd Street because it too was in danger of collapse.[96] The evacuation of these two buildings delayed the contractor's plan to use controlled blasting to remove bedrock in the southern section of the launch box.[97] Until the blasting permits could be issued, MTA required contractors to use mechanical equipment to remove the bedrock, which is slower than blasting out the rock.[98]

The tunnel boring machine was originally expected to arrive six to eight months after construction began, but the utility relocation and excavation required to create its "launch box" delayed its deployment until May 2010.[78] On May 14, 2010, MTA's contractors completed the TBM installation and turned it on at the Second Avenue Subway launch box at 96th Street and boring southward to connecting shafts built at 86th and 72nd Streets.[99][100][101][102][103]

On October 1, 2010, MTA awarded a $431 million contract to joint venture SSK Constructors for the mining of the tunnels connecting the 72nd Street station to the existing Lexington Avenue – 63rd Street station, and for the excavation and heavy civil structures of the 72nd Street station.[104]:301 A subsequent contract was awarded to Skanska Traylor Joint Venture for excavation of the cavern at the 86th Street station on August 4, 2011.[105] In January 2011, MTA awarded Judlau Contracting a 40-month, $176.4 million contract to rebuild and enlarge the Lexington Avenue – 63rd Street station.[106][107]

Workers celebrate after the TBM reaches the BMT 63rd Street Line.

Meanwhile, the tunnel boring machine dug at a rate of approximately 50 feet (15 m) per day. The machine finished its run at the planned endpoint under 65th Street on February 5, 2011.[108] S3 partially disassembled the TBM and backed it out of the tunnel. It was repositioned in the east starter tunnel to begin boring again.[109] Because the east side of Second Avenue has some soft ground not compatible with the Robbins TBM, ground-freezing was undertaken to prepare the soil for the TBM.[100][110][111] On March 28, 2011, S3, having completed its task of completing the 7,200-foot (2,200 m) west tunnel to 65th Street, began drilling the east tunnel, with the first 200 feet (61 m) being through soil frozen by S3 using calcium chloride solution fed through a network of pipes.[112] The TBM drilling the east tunnel will negotiate the curve onto 63rd Street and break through the bellmouth at the existing 63rd Street subway station. The portion of the west tunnel remaining to be created will be mined using conventional drill-and-blast methods, because the curve S3 construction teams would have to negotiate is too tight for the TBM. On September 22, 2011, the TBM completed its run to the Lexington Avenue–63rd Street station's bellmouth.[113][114]

Construction nears completion

The final contract, for architectural and mechanical and electrical work at 72nd, 86th, and 96th Street stations; rehabilitation of the Lexington Avenue – 63rd Street station; and the Systems Contract (track, signals, and communications) for the entire Phase 1 area was awarded on June 1, 2013.[115] On a July 2013 "report card" that indicated the progress of the subway by Congresswoman Carolyn Maloney, the construction progress got a "B".[116] Blasting for the station caverns was finished in November 2013, and the muck houses were taken down at around the same time.[117]

In the winter of 2013, many of the tracks and signal panels began to arrive at the construction site, to be installed on the line over the next few years.[118] It was reported in November 2013 that one third of the tracks for the line had arrived, for the segments of track between 87th and 105th Streets;[118] the tracks were being stored at 96th Street station.[119] On May 2, 2014, it was reported that Phase 1 of the line was 66% complete, and six of the ten construction contracts awarded were already being worked on. As of May 21, 2015, the first phase of construction was more than 80% complete.[120] By August 2015, the construction project was 84.3% complete, with all 10 Phase 1 construction contracts having been awarded and 5 of them having been completed.[121]

In a public meeting in May 2016, the MTA unveiled the first iteration New York City Subway map that included the Second Avenue Subway and a rerouted Q service.[122] At the meeting, the MTA also made several suggestions for service changes, including making the N train express in Manhattan and replacing the Queens section of the Q, as well as the Manhattan local section of the N, with a reinstated W train.[123]

In June 2016, it was reported that contractors for the MTA were not expending extra resources to accelerate the last portion of Phase 1 construction,[124] and that the MTA had only completed 67% of testing, with the line requiring another 1,100 equipment tests by October 2016 in order to be deemed operational.[125] The contractors and the MTA blamed the delays on each other, with the MTA saying that the contractors did not show up to work on certain days; the contractors, on the other hand, said that the MTA had asked for over 2,500 design changes during construction, and in some cases, the contractors had to destroy and rebuild sidewalks, rooms, entrances, and other design elements that had already been built.[126] In July 2016, news outlets reported that the Second Avenue Subway had a "significant risk" of a delayed opening.[127][128][129] The test train for the subway line was not set to run until October 2016, despite the line being projected to open within two months of that date.[127] Also, contractors had only reached 70% of the construction milestones for June 2016, and 80% of the May 2016 milestones. For instance, communications systems at the stations were not finished, despite the fact that these systems should have been wired already, and the elevator at 72nd Street had not been delivered yet. As of July 25, 2016, construction spending was only $32 million for the month, even though a monthly spending goal of $46 million was needed to complete the project on time.[129]

By July 1, 2016, the first phase was 96.3% complete, with only systems testing, architectural finishes, streetscape restorations, and some equipment installations to be completed.[130] The electrification in the third rails went online for train testing in September 2016 to test if the tracks are "safe for service" yet. Non-revenue Q trains are planned to run through the subway in November 2016.[131] Test trains began running through the new line on October 9, 2016 with weights to simulate rush hour loads, even though equipment installations at two stations, as well as a battery of tests, still needed to be completed in order for the line to be opened to passenger service.[132][133][134] Shortly before the first test trains ran, the system's track geometry car determined that the twin bores of the 63rd Street Connector was too narrow for consists of 75-foot (23 m) cars (i.e. trains made of R46s, R68s, or R68As) to enter the line. To accommodate trains of these longer cars, crews shaved down parts of the tunnel walls by mid-October 2016, in time for the test trains.[135] Also in October 2016, new subway signs and maps were erected systemwide in relation to Second Avenue Subway-related service changes,[136] with upward of 1,300 signs being created and installed in more than 40 stations.[137]

Schedules for construction and planning

Tracks in the subway tunnel being laid in February 2015

The MTA and its contractors on the project meet on a regular basis with the Manhattan Community Board 8 Second Avenue Subway Task Force and Manhattan Community Board 11 to report on construction progress and to seek input from the community.[138]

Estimated completion schedules have been widely varying. When the bond issue to fund the construction was passed in 2005, the MTA told The New York Times that the project would be done in 2012.[139] When construction began in 2007, the MTA issued a press release saying that riders would be using the new train line by the end of 2013.[140] Later in 2007, another MTA press release gave a completion date of 2014.[141] In its 2008 capital improvement budget proposal, the MTA pushed back completion of Phase 1 from 2014 to 2015, and in 2009, the MTA pushed it back again to 2016,[142][143] with other publications specifying December 2016 opening.[144][145]

By May 2014, the agency was still targeting December 2016 as a completion date, and the project is still within its $4.45 billion cost, while serving approximately 200,000 daily riders.[146][147] By January 2015, the MTA's forecasted opening date for Phase I had been clarified even further, to around December 30–31, 2016,[118][148][149][150][151] with Horodniceanu describing earlier estimates as lacking "the precision required."[67] In June 2015, however, the federal government predicted that at the then-current rate of construction, the subway would not open until February 2018.[152] As of February 2016, the line is still scheduled to open in December 2016,[148][153] and on February 24, 2016, the MTA allocated $66 million to speed up the construction of the first phase so that it could open in December.[154]

In October 2016, the testing for elevators and fire alarms at 72nd Street still had not been completed, and the MTA said that there was a possibility that the subway could open with trains temporarily bypassing 72nd Street. This had been done before in September 2016, when subway trains in Chelsea temporarily bypassed several stations along 23rd Street due to bombings.[136][155] There was a concern that 86th Street was also not completed, with three escalators not installed yet. The two stations were only conducting 14 equipment tests a week, but there needed to be 40 tests per week in order to ensure that the line would open on time.[155] The tentative opening date was also clarified to "by December 31," with a possibility of a delayed opening.[75][136][156] However, an engineer affiliated with the MTA stated that there was a possibility that the line could be delayed to 2017.[157] In November 2016, an independent engineer on the project raised concerns, including whether the required fire safety testing could be completed by December 15. That engineer said that "unprecedented" was required to complete the line by the year's end.[158] December 31 is still the planned opening date, but there have been logistical and safety concerns about the line's opening on New Year's Eve.[1]

Controversies

In February 2011, a lawsuit was filed by the Yorkshire Towers at 86th Street over the location of two proposed Second Avenue Subway entrances that were located right in front of the building but facing away from its semicircular driveway.[159][160] The quality of life for building tenants was allegedly to be destroyed if the entrances were to be built in the location;[159] however, the lawsuit was later dismissed.[161][162] In an unrelated 2012 controversy, some residents in the 72nd Street station area claimed to have come down with a "Second Avenue cough" caused by dust from construction,[163] and local doctors saw that the air quality of the area had decreased while nasal sicknesses had increased.[164] The MTA tried to combat this by creating new structures and using other methods to reduce dust inhalation.[165] The MTA prepared a report that said in the 86th Street station area "all monitored concentrations were below the established benchmark levels".[166]

The New York Daily News alleged that the subway project was very unsafe. For example, on August 8, 2012, an explosion caused rocks to fly all over an intersection.[163][167] Less than two weeks later, on August 21, 2012, an uncontrolled blast for the station was done incorrectly,[168] causing a large explosion that sent debris into the air and broke windows of buildings in the area and damaged nearby sidewalks.[163][167][169][170][171] In another instance, contaminated rocks were carried away from a construction site on 63rd Street, and the incident went unnoticed.[163] On March 19, 2013, in yet another allegation of wrongdoing, a construction worker got stuck in waist-deep muck at the 96th Street station site,[172][173] but while he was extricated after four hours of rescue efforts, he nearly died after the incident.[174][175]

Other complaints included noise complaints caused by blasting underground. In response to this, the MTA limited blasting to before 7 p.m. each day.[176]

In a product-related controversy involving the Second Avenue Subway project, American Standard Testing and Consulting Laboratories (ASTCL), company president Alan Fortich, and five other executives admitted filing false documents on the subway tunnels and "thousands" of other New York City construction projects within 10 years. ASTCL had replaced Testwell Inc., another firm indicted for faking concrete tests, in 2008.[177]

Other phases

An early computer-generated image of a future Second Avenue Subway station

The second phase, between 125th and 96th Streets, was allocated $525 million in the MTA's 2015–2019 Capital Plan for planning, design, environmental studies, and utility relocation.[43][178] This phase will complete the project's East Harlem section. The alignment will run under Second Avenue to 124th Street,[179] before turning west on 125th Street, crossing Lexington Avenue, before ending at Fifth Avenue to accommodate storage tracks. This phase will utilize a tunnel section built during the 1970s from 110th Street to 120th Street and this section will have tracks and other essential equipment installed. Three new stations will be constructed at 125th Street, 116th Street, and 106th Street. Because a station at 116th Street was not part of the plan for the Second Avenue Subway when the existing tunnel section was built, part of the tunnel will have to be rebuilt to allow for a station at 116th Street. A transfer to the Lexington Avenue Line and an intermodal connection with Metro-North Railroad would be available at the 125th Street station. While the main line would turn west onto 125th Street, tail tracks would continue north via Second Avenue to 129th Street that would allow for future expansion into the Bronx. Tail tracks to Fifth Avenue would allow for the construction of a crosstown line under the busy 125th Street corridor.[180]

This budget originally carried $1.5 billion, which would be used to start construction of the tunnels; the MTA reduced the amount of money allocated in the budget, projecting that the agency would not be able to start construction by the end of the 5-year cycle in 2019. Now, construction of the tunnels will likely be funded in future 5-year capital programs, and possibly not start until 2020.[42][181] Although the MTA previously expressed concerns about funding the Capital Program, spokesman Adam Lisberg stated that the reduction in funding was a result of uncertain timing and not money issues.[182] The delay had upset politicians and residents of East Harlem,[183] who objected to the 3-to-4-year delay.[43] In March 2016, the MTA began advertising Requests for Proposals (RFP) for three new contracts for the second phase, which were planned to be awarded in summer 2016.[184][185] In April 2016, the MTA and the State of New York reached a deal to restore funding to Phase 2, with a total of $1.035 billion allocated.[186] $535 million will be used to undertake preliminary construction work, such as relocating utilities, and for the design of the project, and to address environmental issues. The next $500 million would be used to prepare work for tunneling and station construction.[180]

On October 18, 2016, a rezoning plan for East Harlem was announced by the de Blasio administration. The plan would alter special transit zoning created in the 1970s for the Second Avenue Subway. Incentives would be offered to integrate subway infrastructure into new buildings. This is meant to improve pedestrian conditions adjacent to ventilation buildings.[187] There would be three Special Transit Land Use (TA) districts; one for the area of the 106th Street station, one for the area of the 116th Street station, and one for the area of the 125th Street station.[188]

Phase 3, from 63rd to Houston Streets, has no funding commitments.[153] Phase 4, from Houston Street to Hanover Square, also has no funding commitments.[153]

The construction of the Second Avenue Subway will be built with options for future expansions into the Bronx and Brooklyn. In order to allow for a future line into the Bronx, a bellmouth would be constructed along Second Avenue north of 125th Street as part of a proposed underground storage yard. With the Hanover Square station planned to be located 85 feet (26 m) below sea level, the elevation will be deep enough to allow for the potential extension of Second Avenue Subway service to Brooklyn through a new tunnel under the East River.[189]

Construction methods

Tunnel at 64th Street
Street-level work at 83rd Street
Second Avenue Subway Community Information Center

Planned construction methods varied depending on the section of the line, due to varying underground conditions. The methods planned for each section were as follows:[190][191]

Streets Construction method Streets Construction method Streets Construction method
5–2 Aves Tunnel Boring Machine 101–95 Cut and Cover 43–41 Mined with Cut and Cover
125–123 Mined with Cut and Cover 95–87 Tunnel Boring Machine 41–34 Tunnel Boring Machine
123–120 Tunnel Boring Machine 87–84 Mined with Cut and Cover 34–32 Cut and Cover
120–117 Existing 84–73 Tunnel Boring Machine 32–24 Tunnel Boring Machine
117–114 Cut and Cover 73–71 Mined with Cut and Cover 24–22 Mined with Cut and Cover
114–109 Existing 71–58 Tunnel Boring Machine 22–15 Tunnel Boring Machine
109–106 Cut and Cover 58–56 Cut and Cover 15–11 Cut and Cover
106–101 Existing 56–43 Tunnel Boring Machine 11–Hanover Undecided

A number of methods will be used to tunnel for 13.7 kilometers (8.5 mi) underneath Manhattan, which is densely populated. About 90% of the tunneling is to be performed by a tunnel boring machine. The rest will be done using the cut and cover method and mined drill and blast, for sections, generally the 16 stations, that average 275 meters (902 ft) in length. The stations at 86th and 72nd Streets were mined. This was challenging, given the number of expensive high rise properties in their vicinities. The 96th Street cut-and-cover station was about 15 meters (49 ft) deep, making it one of the shallowest stations being built on the line; the shallowness was so that the new line could align with the preexisting piece of subway tunnel built in the 1970s between 99th and 105th Streets. Stations at the two mined stations are between 25.9 and 27.4 meters (85 and 90 ft) deep in rock. The construction method that was used was supposed to ease concerns for buildings above the station sites, because only two shafts were required for excavation.[192]

In Phase 1, there was tunneling between East 63rd and 92nd Streets and a 248-by-23-meter-wide (814 by 75 ft) TBM launch box was built. That tunnel box is now part of the 96th Street station. Two access shafts were constructed for the 72nd Street station. Slurry or diaphragm walls, 1.1 meters (3.6 ft) wide and 6.1 meters (20 ft) long and about 35 meters (115 ft) deep, were built alongside the sections between East 93rd and 95th Streets. Since the rock is shallower between East 91st and 93rd Streets, 1.1-meter-diameter (3.6 ft) secant piles did the same work at shallower depths.[192]

Earth excavation was conducted between walls once they were installed, and box structures were built using a bottom-up construction method. Temporary decking constituted the top of the boxes, and the decking both braced the excavation and supported the walls and Second Avenue traffic.[192] Of the below-ground obstacles, Arup director of construction David Caiden stated: "It's a spaghetti of tunnels, utilities, pipes and cables — I've never seen anything like it."[192] Complicating the process, the project must go over, or under, subway lines, Amtrak railway lines, and the Queens-Midtown Tunnel linking Manhattan and Queens, in later phases.[192]

There are three options for subway construction between 11th Street and Hanover Square. One option known as the Shallow Chrystie Option would mainly use cut and cover, while the Deep Chrystie Street and Forsyth Option would use a combination of the Earth Pressure Balance Machine (EPBM) and cut and cover.[191] The Shallow Chrystie Option would have used the existing Confucius Plaza tunnel section between Canal and Pell Streets, and like the 1974 plan, there would have been a cross-platform transfer to the existing Grand Street station, with the transfer expected to be heavily used. However, this option would require digging up Sara D. Roosevelt Park to the east as Chrystie Street is not wide enough to fit four tracks. Under this option, a track connection would be built to allow trains from Second Avenue to run via the Manhattan Bridge north tracks to allow service to Brooklyn. The Forsyth Option would curve below the park to Forsyth Street and the station would be built under Forsyth Street, requiring a 200-foot transfer passageway that would be less convenient than the other options. The Deep Chrystie Option would have the Second Avenue Subway run deeper underground, running underneath the existing Grand Street station, with a mezzanine in between the two stations. In order to allow for sufficient room for stairways to transfer to the Second Avenue Line, the Grand Street station would be widened to have twenty foot wide platforms. No track connection would be built under this option, and the Confucius Plaza tunnel section would not be used for subway service, but it instead it might be used for ancillary subway facilities. Currently, this is the preferred option.[9][193]

There were geological anomalies along the way. Manhattan's geology changes along the subway's length, passing through rock and soft ground, consisting of sands, silts, and clays over Manhattan schist, and there are faults and shear zones as well as fractured rock. Hard-rock Tunnel Boring Machines 6.7 meters (22 ft) in diameter tunneled during the first phase, progressing at a rate of about 20 meters (66 ft) per day.[192]

The stations on the line were built so that they are more wide open than most other underground subway stations in the system;[194] because of this, Horodniceanu likened the Second Avenue Subway stations to the stations on the Washington Metro.[195] The tracks themselves are built atop rubber padding so as to reduce the noise from the trains.[196]

Service

Route

The track junction with the BMT 63rd Street Line south of 72nd Street

The plans for the Second Avenue Subway involve digging 8.5 miles (13.7 km) of new tunnel from 125th Street in Harlem south to Hanover Square, which is located in the Financial District of Lower Manhattan.[197][198] During Phase 1, the initial phase, the line was to begin at the intersection of Second Avenue and 96th Street, running south to join the BMT Broadway Line via the existing, but rarely used, BMT 63rd Street Line. Phase I stations will be located at 96th Street, 86th Street and 72nd Street.[197][198] The Q service will be routed to 96th Street.[198][199][200] The Q service will initially have a rush-hour service frequency of 7.5 to 10 trains per hour, or one train every 8 to 6 minutes in each direction; by contrast, the IRT Lexington Avenue Line's express tracks (4 5 trains) have an estimated rush-hour frequency of 30 trains per hour, or one train approximately every 2 minutes in each direction.[201][202] N trains that currently short-turn at 57th Street will be extended to 96th Street using the Second Avenue Subway.[203]

In Phase 2, Q service would be extended to 125th Street and Lexington Avenue.[198] In order to allow for the construction of Phase 3, bellmouths have been constructed at the turnoff to the BMT 63rd Street Line.[134] With the construction of Phase 3 completed, a new T service[204] will operate from 125th Street to Houston Street.[198] After Phase 4 opens, T service will run the full length of the line, from 125th Street to Hanover Square.[198]

The Second Avenue Subway's infrastructure also includes a connection to the BMT Broadway Line, utilizing an existing connection via the 63rd Street Line as part of phase 1.[197] The Q service will operate northward from 57th Street–Seventh Avenue, curving east under Central Park on the 63rd Street Line.[197][199][200][205] The Q train would stop at Lexington Avenue–63rd Street with a cross-platform interchange to the F train before merging with the Second Avenue Line at 64th Street.[197] Thus, after Phase 4 is completed, the residents of Spanish Harlem and the Upper East Side will have direct mass transit service down both Second Avenue and Broadway (via transfer) to the Financial District, and across the Manhattan Bridge to Brooklyn via the Q train.[197][198]

An additional two-track connection is planned between the line toward Lower Manhattan (around 63rd Street) and the IND 63rd Street Line toward Queens using existing bellmouths that are at 63rd Street and First Avenue. Current plans do not call for it to be used by regular service, but instead to be used for non-revenue moves, and to provide a connection to the Jamaica subway yard[197][198] The connection would allow for trains to run from the Financial District to Queens if the capacity of the IND Queens Boulevard Line was increased, or if the Queens Bypass was built.[9] Provisions are also being made for an extension north under Second Avenue past 125th Street to the Bronx, and an extension south to Brooklyn.[197][198]

Stations

Station[197] Phase[197] Transfers & Notes[197]
Provision for expansion crosstown along 125th Street
125th Street 2 4 5 6 <6> trains (IRT Lexington Avenue Line) at Lexington Avenue and 125th Street
M60 Select Bus Service to LaGuardia Airport
connection to Harlem–125th Street (Metro-North Railroad)
northern terminal station for Q train (Phase 2) and T train (Phase 3)
Provision for expansion to The Bronx
116th Street 2
106th Street 2
96th Street 1 northern terminal station for Q train in Phase 1
86th Street 1
72nd Street 1
Q train splits to/from BMT Broadway Line via BMT 63rd Street Line (Phase 1)
T train continues down Second Avenue (Phase 3)
55th Street[note 2] 3 E M trains (IND Queens Boulevard Line) at Lexington Avenue–53rd Street
4 6 <6> trains (IRT Lexington Avenue Line) at 51st Street
42nd Street[note 2] 3 7 <7> trains (IRT Flushing Line)
S train (IRT 42nd Street Shuttle)
4 5 6 <6> trains (IRT Lexington Avenue Line) at Grand Central  42nd Street
connection to Grand Central Terminal (Metro-North Railroad & Long Island Rail Road once East Side Access Project is completed)
34th Street 3 M34 & M34A Select Bus Service to East River Ferry at East 34th St and Amtrak, NJ Transit, & Long Island Rail Road at Penn Station
23rd Street 3
14th Street[note 2] 3 L train (BMT Canarsie Line) at Third Avenue
Houston Street[note 2] 3 F train (IND Sixth Avenue Line) at Second Avenue
southern terminal station for T train (Phase 3)
Grand Street 4 B D trains (IND Sixth Avenue Line) at Grand Street
Chatham Square 4 at Worth Street
Seaport 4 at Fulton Street
Hanover Square 4 at Old Slip
southern terminal station for T train (Phase 4)
Provision for expansion to Brooklyn

Future full-length designation

The MTA had decided to designate the future, full-length Second Avenue service with the letter T, in part because:[206]

The T's route emblem was colored turquoise (hex triplet #00ADD0, which could also be considered robin's egg blue or teal) because the color had also been used for the JFK Express in the past. In 2011, turquoise was considered "the color of the year", and at the time of the color's selection in the 2000s, it was also considered a very upscale color.[59]

See also

Notes

  1. The tunnel plan was revitalized as part of the 2005 Transportation Bond Act, which would connect the LIRR trackage to Grand Central Terminal via the 63rd Street Tunnel as part of the East Side Access project.[17]
  2. 1 2 3 4 Transfer under evaluation (mta.info).

References

  1. 1 2 "MTA: 2nd Ave. subway's Dec. 31 launch poses 'challenges'". am New York. Retrieved 2016-11-17.
  2. 1 2 Sargent, Greg (March 29, 2004). "The Line That Time Forgot – Second Avenue Subway". New York. Retrieved August 2, 2009.
  3. "The line that time forgot". PlanNYC. April 5, 2004. Archived from the original on July 20, 2011. Retrieved August 2, 2009.
  4. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 "www.nycsubway.org: Second Avenue Subway: The Line That Almost Never Was". nycsubway.org. 1972. Retrieved September 30, 2015.
  5. 100 Miles [160 km] of Subway in New City Project; 52 of them in Queens, New York Times September 16, 1929 page 1
  6. 1 2 3 4 5 6 7 8 "IND Second System 1929 Plan". nycsubway.org. Retrieved 2016-03-25.
  7. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Raskin, Joseph (2013). The Routes Not Taken: A Trip Through New York City's Unbuilt Subway System. Fordham University Press. ISBN 978-0-8232-5369-2.
  8. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Sam Jewler (July 24, 2004). "The Long, Tortured History of the Second Avenue Subway". New York. Retrieved August 14, 2015.
  9. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 "Second Avenue Subway Final Environmental Impact Statement (FEIS), May 2004 Appendix B Development of Alternatives" (PDF). mta.info. Metropolitan Transportation Authority. May 2004. Retrieved August 7, 2016.
  10. "MANHATTAN SALES: Second Avenue Subway Project Causes 50 Percent Rise in Prices.". The New York Times. September 2, 1929. Retrieved August 14, 2015.
  11. 1 2 3 "Second Avenue Subway Project - History". 2002-10-19. Archived from the original on 2002-10-19. Retrieved 2016-02-15.
  12. Staff. "Second Avenue 'El' Coming to a Stop", The Christian Science Monitor, June 13, 1942. Retrieved October 12, 2008.
  13. "2nd Ave. Subway History". Second Ave. Sagas. Retrieved 2016-02-07.
  14. 1 2 3 "Board of Transportation – 1951". Thejoekorner.com. Retrieved March 25, 2014.
  15. 1 2 Neuman, William (March 24, 2007). "A Museum-Quality Car for a Subway Yet Unbuilt". The New York Times. Retrieved September 30, 2015.
  16. 1 2 R-11 Datasheet
  17. "U.S. Transportation Secretary Signs Record $2.6 Billion Agreement To Fund New Tunnel Network To Give Long Island Commuters Direct Access to Grand Central Station" (Press release). U.S. Department of Transportation. December 18, 2006. Archived from the original on July 9, 2009. Retrieved January 18, 2007.
  18. "Last Train Rumbles On Third Ave. 'El'; An Era Ends With Final Run of Third Avenue 'El' LAST TRAIN ROLLS ON THIRD AVE. 'EL'". Retrieved 2016-08-23.
  19. 1 2 "Second Avenue Subway Final Environmental Impact Statement (FEIS): Appendix B: Development of Alternatives" (PDF). Metropolitan Transportation Authority. Retrieved August 5, 2015.
  20. "The Subway Compromise". The New York Times. July 28, 1969. Retrieved July 9, 2015.
  21. 2nd Avenue Subway – Tentative track plan, Manhattan portion, nycsubway.org
  22. Text of the Urban Mass Transportation Act of 1964. Retrieved August 14, 2015.
  23. "Full text of "Metropolitan transportation, a program for action. Report to Nelson A. Rockefeller, Governor of New York."". Internet Archive. November 7, 1967. Retrieved February 12, 2016.
  24. 1 2 3 4 5 6 "ROUTE 132-C - PHASE I REPORT, Second Avenue and Water Street Subway". New York City Transit Authority. nycsubway.org. June 1973. Retrieved February 13, 2016.
  25. "DRAFT ENVIRONMENTAL STATEMENT, SECOND AVENUE SUBWAY, ROUTE 132-A". Urban Mass Transportation Administration. nycsubway.org. August 1971. Retrieved February 13, 2016.
  26. 1 2 New York Media, LLC (8 February 1971). New York Magazine. New York Media, LLC. pp. 39–. ISSN 0028-7369.
  27. Second Avenue Subway: Timeline. Retrieved April 7, 2014.
  28. 1 2 "Second Avenue Subway". Metropolitan Transportation Authority. Archived from the original on April 8, 2014. Retrieved April 7, 2014.
  29. 1 2 3 4 5 Burks, Edward C. (October 25, 1973). "GROUND IS BROKEN FOR 2D AVE. LINK; Downtown Subway Section Begins With Ceremony Led by Lindsay and Ronan Projects Are Listed Interest in French Train". The New York Times. p. 51. Retrieved October 4, 2015.
  30. Burks, Edward C. (July 26, 1974). "Beame and Wilson Man the Jackhammers To Start 4th Segment of 2d Ave. Subway; A 1920's Project Some See No Alternative Rush Hour Still Jammed Headache for Neighbors Completion Set for '75". The New York Times. p. 10. Retrieved October 4, 2015.
  31. Hausner, The New York Times/Edward (January 10, 1975). "2d Ave. Tunnelers Push On, Despite Potential Futility; Proposal by Beame". The New York Times. p. 78. Retrieved October 4, 2015.
  32. 1 2 Burks, Edward C. (September 26, 1975). "WORK IS STOPPED ON SUBWAY LINE; City Lacks Funds to Finish Part of 2d Ave. Project". The New York Times. p. 41. Retrieved October 4, 2015.
  33. Chan, Sewell (November 14, 2005). "The Bond Passed. Now Comes the Hard Part: Actually Building a 2nd Avenue Subway". The New York Times. Retrieved April 7, 2014.
  34. "The Line That Time Forgot – Second Avenue Subway". New York. April 5, 2004. Retrieved April 10, 2014.
  35. 1 2 FAQ: Completed Portions of the 2nd Avenue Subway. Retrieved April 7, 2014.
  36. 1 2 "Video: Explore The Abandoned Second Avenue Subway Tunnels". Gothamist. February 1, 2012.
  37. Finder, Alan (April 19, 1994). "A Tunnel Waiting Two Decades for a Train; Shafts for the Second Avenue Subway Are Maintained, in Case the Line Is Ever Built". The New York Times. p. B1. Archived from the original on March 7, 2016. Retrieved October 4, 2015.
  38. "Second Avenue Subway Final Environmental Impact Statement (FEIS)". MTA Capital Construction. Retrieved 2016-03-31., first released in April 2004.[39]
  39. 1 2 "Press Release - MTA Headquarters - Second Avenue Subway History". MTA. 2007-04-12. Retrieved 2016-03-31. In April 2004, the Second Avenue Subway Final Environmental Impact Statement (FEIS) was published.
  40. "96th Street Station Area" (PDF). Second Avenue Subway Newsletter. October 2013. Retrieved February 14, 2016.
  41. "96th Street Station Area" (PDF). Second Avenue Subway Newsletter. November 2013. Retrieved February 14, 2016.
  42. 1 2 "MTA to propose $1.5B to Phase 2 of 2nd Ave. subway construction". Daily News. New York.
  43. 1 2 3 Fitzsimmons, Emma G. (October 29, 2015). "Anger in East Harlem Over New Delays in 2nd Ave. Subway Plans". The New York Times. Retrieved November 3, 2015.
  44. 1 2 "Second Avenue Subway Final Environmental Impact Statement (FEIS): Appendix B: Development of Alternatives" (PDF). mta.info. Metropolitan Transportation Authority. Retrieved 5 August 2015.
  45. 1 2 "Second Avenue Subway Final Environmental Impact Statement (FEIS): Chapter 2: Project Alternatives" (PDF). mta.info. Metropolitan Transportation Authority. Retrieved 5 August 2015.
  46. 1 2 "Second Avenue Subway Final Environmental Impact Statement (FEIS): Deep Chrystie Option" (PDF). mta.info. Metropolitan Transportation Authority. Retrieved 9 July 2015.
  47. Donohue, Pete (June 24, 2013). "Underground subway party could put organizers in hot water: MTA: Gothamist website printed pictures of the bash. MTA says it'll turn over case to NYPD.". nydailynews.com. Daily News (New York). Retrieved 5 August 2015.
  48. Kabak, Benjamin (June 25, 2015). "Abandoned SAS segment party prompts NYPD inquiry". secondavenuesagas.com. Retrieved 5 August 2015.
  49. "Second Avenue Subway Final Environmental Impact Statement (FEIS): Chapter 3: Description of Construction Methods and Activities" (PDF). mta.info. Metropolitan Transportation Authority. Retrieved 5 August 2015.
  50. "Second Avenue Subway Final Environmental Impact Statement (FEIS): Track Diagram, South of 57th Street" (PDF). mta.info. Metropolitan Transportation Authority. Retrieved 9 July 2015.
  51. 1 2 "Second Avenue Subway in the Borough of Manhattan, New York County, New York Final Environmental Impact Statement And Final Section 4(f) and Section 6(f) Evaluation". April 2004. pp. 1–5, 1–6. Archived from the original (PDF) on April 8, 2014. Retrieved September 22, 2011.
  52. "Facts and Figures". Metropolitan Transportation Authority.
  53. 1 2 3 4 5 "Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS), April 2003 Appendix B Development of Alternatives" (PDF). mta.info. Metropolitan Transportation Authority. April 2003. Retrieved August 9, 2016.
  54. 1 2 3 4 "Manhattan East Side Transit Alternatives (MESA)/Second Avenue Subway Summary Report" (PDF). mta.info. Metropolitan Transportation Authority. October 11, 2001. Retrieved August 9, 2016.
  55. "Supplemental Draft Environmental Impact Statement on the Manhattan East Site Alternatives Project— Second Avenue Subway. AGENCY: Federal Transit Administration, DOT. ACTION: Notice of intent to prepare a supplemental draft environmental impact statement." (PDF). mta.info. Federal Transit Administration. March 22, 2001. Retrieved August 9, 2016.
  56. "Second Avenue Subway History". Metropolitan Transportation Authority. April 12, 2007. Archived from the original on 2015-12-21. Retrieved January 16, 2016.
  57. "Manhattan East Side Alternatives Study Summary Report" (PDF). Metropolitan Transportation Authority. Retrieved January 16, 2016.
  58. Arnold, Hallie (December 18, 2003). "Hinchey and Sweeney grab federal aid" (PDF). Taconic Press. Retrieved August 10, 2016 via Fultonhistory.com.
  59. 1 2 Christine Haughney (August 22, 2011). "Train Line Far From Arrival Has a Color to Be Noticed". The New York Times. Retrieved August 14, 2015.
  60. "MTA Capital Construction – Second Avenue Subway Project Description". Metropolitan Transportation Authority. Archived from the original on April 8, 2014. Retrieved October 5, 2013.
  61. "Second Avenue Subway Final Environmental Impact Statement (FEIS), May 2004 Figure 2-4 Track Diagram, South of 55th Street" (PDF). mta.info. Metropolitan Transportation Authority. May 2004. Retrieved August 7, 2016.
  62. "Second Avenue Subway Final Environmental Impact Statement (FEIS), May 2004 Figure 2-4 Track Diagram, North of 55th Street" (PDF). mta.info. Metropolitan Transportation Authority. May 2004. Retrieved August 7, 2016.
  63. 1 2 "Rising costs shelve third Second Ave. Subway track at 72nd :: Second Ave. Sagas". Secondavenuesagas.com. Retrieved May 14, 2014.
  64. 1 2 mta.info—Community Board 8 Second Avenue Subway Task Force Archived April 8, 2014, at the Wayback Machine., June 17, 2008
  65. "Supplemental Environmental Assessment to the Second Avenue Subway Final Environmental Impact Statement: 72nd and 86th Street Station Entrance Alternatives Chapter 1: Purpose and Need" (PDF). mta.info. Metropolitan Transportation Authority. October 29, 2009. Retrieved August 9, 2016.
  66. Donohue, Pete (August 4, 2006). "Cooler Subways Coming Eventually". Daily News. New York. Archived from the original on October 10, 2007. Retrieved December 12, 2008.
  67. 1 2 Rivoli, Dan, "Second Avenue Subway Scenes," amNew York, May 2–4, 2014, p.6
  68. NYC Subway Deaths Spur Officials to Call for Action Archived November 5, 2013, at the Wayback Machine., The Epoch Times.
  69. 1 2
  70. 1 2 "Drone takes tour of NYC's 2nd Avenue subway line". CBS News. 2015-09-16. Retrieved 2016-10-27.
  71. Nonko, Emily (January 30, 2014). "Updates on NYC's Biggest Subway Projects: Second Avenue and East Side Access". NewYork.com. Retrieved June 5, 2014.
  72. Stabile, Tom (May 2006). "New York's Subway System Finally Starting Major Expansion". newyork.construction.com. Archived from the original on May 9, 2008. Retrieved December 12, 2008.
  73. Nolan, Caitlin (May 16, 2014). "Second Avenue subway line construction is progressing: officials". Daily News. New York. Retrieved May 19, 2014.
  74. Smith, Stephen J. (October 2, 2013). "The Next 20 Years for New York's MTA – Next City". Nextcity.org. Retrieved June 5, 2014.
  75. 1 2 "The Second Avenue subway explained". am New York. Retrieved 2016-10-27.
  76. Chan, Sewell (November 9, 2005). "Voters Approve Transit Bonds for $2.9 Billion". The New York Times. Retrieved September 20, 2007.
  77. "U.S. Transportation Secretary Signs Record $2.6 Billion Agreement to Fund New Tunnel Network To Give Long Island Commuters Direct Access to Grand Central Station". United States Department of Transportation. December 18, 2006. Archived from the original on July 9, 2009. Retrieved September 20, 2007.
  78. 1 2 "Second Avenue Subway: A Status Report" (PDF). Retrieved August 2, 2009.
  79. "Arup to design new Second Avenue Subway, New York". Arup. November 20, 2001. Archived from the original on February 5, 2009. Retrieved June 9, 2013.
  80. "Second Avenue Subway: Transport Consulting". Arup. Archived from the original on February 2, 2009. Retrieved June 9, 2013.
  81. MTA Press Release March 20, 2007—First Construction Contract Signed for Second Avenue Subway; Work to Begin in April
  82. Olshan, Jeremy (March 21, 2007). "Second Ave. Tunnel Vision". New York Post. Archived from the original on April 16, 2009. Retrieved January 9, 2009.
  83. "MTA Signs Second Ave. Subway Contract". New York Sun. March 21, 2007. Retrieved February 20, 2010.
  84. 2nd Avenue Subway Contract Signed – WNYC Newsroom, March 21, 2007
  85. NY Construction—Top Projects Archived September 16, 2012, at the Wayback Machine., page 1.
  86. "Second Avenue subway groundbreaking: Is 4th time the charm?". The Journal News. April 12, 2007. Archived from the original on September 30, 2007. Retrieved April 18, 2007.
  87. "Second Avenue Subway Breaks Ground" (Press release). Metropolitan Transportation Authority. 2007-04-12. Retrieved 2015-12-24.
  88. "MTA Capital Construction – Second Avenue Subway: History". Metropolitan Transportation Authority. Archived from the original on April 8, 2014.
  89. Neuman, William (November 19, 2007). "U.S. Approves $1.3 Billion for 2nd Avenue Subway". The New York Times. Retrieved November 19, 2007.
  90. "Microsoft PowerPoint – 0080617_CB8_Final [Compatibility Mode]" (PDF). Retrieved August 2, 2009.
  91. "Microsoft PowerPoint – 080729_CB8_Final_distribution version" (PDF). Retrieved August 2, 2009.
  92. "MTA Capital Construction – Second Avenue Subway: Documents". Metropolitan Transportation Authority. Archived from the original on June 25, 2013. Retrieved October 5, 2013.
  93. "MTA Capital Construction Recent Contract Awards. Retrieved May 30, 2009". Metropolitan Transportation Authority. Retrieved August 2, 2009.
  94. “SECOND AVENUE SUBWAY PROJECT”, 2013 Rail Conference, apta.com
  95. Namako, Tom (June 6, 2009). "2nd Ave. Subway Caused Building Evac: Officials". New York Post.
  96. Sutherland, Amber; Namako, Tom (July 1, 2009). "Second Ave. Tenants RIP 'Train Wreck'". New York Post.
  97. Rivoli, Dan (September 2, 2009). "2nd Ave. Subway Delays". Our Town. Archived from the original on July 15, 2011. Retrieved February 20, 2010.
  98. Simeone, Jessica; Namako, Tom (September 26, 2009). "Second Ave. on Snail Rail". New York Post.
  99. " "Blasting on Second Avenue". thelaunchbox.blogspot.com. March 22, 2010.
  100. 1 2 Siff, Andrew (May 14, 2010). "2nd Ave. Subway Tunnel Dig Begins". WNBC. Retrieved May 14, 2010.
  101. "Tunneling Begins Under Second Avenue". Metropolitan Transportation Authority. May 14, 2010. Retrieved May 17, 2010.
  102. "MTA Launches Second Avenue Subway Tunnel Boring Machine" (Press release). Metropolitan Transportation Authority. May 14, 2010. Retrieved October 5, 2013.
  103. Exclusive: Ground Breaking For 2nd Avenue Subway Line Weeks Away Archived October 11, 2007, at the Wayback Machine. – NY1, January 24, 2007
  104. Davidson, G.; Howard, A.; Jacobs, L.; Pintabona, R.; Zernich, B. (2014). North American Tunneling: 2014 Proceedings:. Society for Mining Metallurgy. p. 301. ISBN 978-0-87335-400-4. Retrieved November 15, 2015.
  105. "COMMUNITY BOARD EIGHT PROJECT UPDATE" (PDF). Metropolitan Transportation Authority. September 26, 2011. Retrieved November 15, 2015.
  106. "MTA Capital Construction – Procurement". Metropolitan Transportation Authority.
  107. "Freeze Ground, Thaw Hearts". Engineering News. February 2, 2011. Archived from the original on September 14, 2015. Retrieved August 15, 2015.
  108. COMMUNITY BOARD EIGHT PROJECT UPDATE, MTACC, February 15, 2011
  109. "Excavation of West Tunnel for Second Avenue Subway Almost Complete" (Press release). Metropolitan Transportation Authority. Retrieved February 5, 2011.
  110. "Boring Manhattan: Ceremony Launches Subway Project". WCBS-TV. Associated Press. May 14, 2010. Archived from the original on May 17, 2010. Retrieved May 14, 2010.
  111. Roth, Jamie (May 14, 2010). "Boring for new 2nd Avenue subway begins". WABC-TV. Retrieved May 14, 2010.
  112. "Tunneling for Second Avenue Subway Continues". Metropolitan Transportation Authority. March 28, 2011. Retrieved September 24, 2011.
  113. "Second Avenue Subway TBM Breakthrough 9/22/2011". MTAPhotos. Flickr. Retrieved October 5, 2013.
  114. "Second Avenue Subway has a breakthrough moment; several billion more are all the M.T.A. wants". Capital NY. September 23, 2011. Retrieved May 27, 2014.
  115. "MTA Awards Final Contract to Build Phase 1 of the Second Avenue Subway" (Press release). Metropolitan Transportation Authority. June 13, 2013. Retrieved November 15, 2015.
  116. http://maloney.house.gov/sites/maloney.house.gov/files/documents/transportation/2ndavesubway/20130729Fourth2ndSubwayReportCardReport.pdf
  117. Mann, Ted (November 22, 2013). "Blasting Completed on Second Avenue Subway Project". The Wall Street Journal. Retrieved November 15, 2015.
  118. 1 2 3 MTA.info—Second Avenue Subway Quarterly Report Q4 2013
  119. Harshbarger, Rebecca (November 4, 2013). "MTA gives new peek at 2nd Ave. subway". New York Post. Retrieved May 13, 2014.
  120. Rebecca Harshbarger (May 21, 2015). "Second Avenue Subway more than 80 percent complete". New York Post. Retrieved June 1, 2015.
  121. "July 2015 Task Force Presentation" (PDF). mta.info. Metropolitan Transportation Authority. July 2015. Retrieved August 9, 2015.
  122. "It's Official: MTA Adds Second Avenue Subway Line to its Maps". TWC News. Retrieved 2016-05-26.
  123. "May 2016 - MTA Board Action Items" (PDF). Metropolitan Transportation Authority: 56–67. May 2015. Retrieved 2016-05-27.
  124. Rivoli, Dan (2016-06-20). "Contractor in no hurry to help finish Second Ave. subway project". NY Daily News. Retrieved 2016-06-21.
  125. Furfaro, Danielle (2016-06-21). "There's a good chance the Second Avenue Subway won't be finished on time". New York Post. Retrieved 2016-06-21.
  126. Furfaro, Danielle (2016-06-23). "Blame design changes for the Second Avenue Subway delays". New York Post. Retrieved 2016-06-23.
  127. 1 2 Tangel, Andrew (2016-07-26). "Second Avenue Subway Project Is Slowed". Wall Street Journal. ISSN 0099-9660. Retrieved 2016-07-26.
  128. Plitt, Amy (2016-07-26). "Second Avenue Subway at 'significant risk' of being delayed again". Curbed NY. Retrieved 2016-07-26.
  129. 1 2 "'Disappointing Delay' in June Puts 2nd Ave. Subway Behind: MTA Consultant". DNAinfo New York. Retrieved 2016-07-26.
  130. Peyton, Tom (July 21, 2016). "Community Board 8 Second Avenue Subway Task Force Update" (PDF). mta.info. Metropolitan Transportation Authority. Retrieved July 25, 2016.
  131. "Sources: MTA Powered Third Rail for Testing on Second Avenue Subway Tracks". TWC News. 2016-09-16. Retrieved 2016-09-18.
  132. Rivoli, Dan (2016-10-10). "SEE IT: MTA finally testing trains along Second Ave. subway line". NY Daily News. Retrieved 2016-10-10.
  133. Furfaro, Danielle (2016-10-10). "MTA finally starts testing trains on the Second Avenue Subway". New York Post. Retrieved 2016-10-10.
  134. 1 2 2nd Avenue Subway (2016-10-27). Second Avenue Subway Test Train. Retrieved 2016-10-28 via YouTube.
  135. Rivoli, Dan (2016-10-23). "Second Ave. subway crews carve tunnel wall to fit trains". NY Daily News. Retrieved 2016-10-23.
  136. 1 2 3 Fitzsimmons, Emma G. (2016-10-24). "After Almost a Century, the 2nd Avenue Subway Is Oh-So-Close to Arriving". The New York Times. ISSN 0362-4331. Retrieved 2016-10-27.
  137. Rivoli, Dan (October 25, 2016). "MTA creating 1,300 subway signs for return of W train". NY Daily News. Retrieved 2016-10-28.
  138. "Second Avenue Subway Construction Progress Update (November to March)" (PDF). September 23, 2009. Retrieved August 2, 2009.
  139. "The Bond Passed. Now Comes the Hard Part: Actually Building a 2nd Avenue Subway.". The New York Times. November 14, 2005. Retrieved July 29, 2016.
  140. "Second Avenue Subway Breaks Ground".
  141. "Governor Spitzer and FTA Administrator James Simpson Announce Federal Funding Guarantee For Second Avenue Subway's First Phase".
  142. Donohue, Pete (April 24, 2009). "Second Ave. subway set back – again". Daily News. New York. Retrieved February 20, 2010.
  143. "090924_C1C2AC5ACombined_CB8_final+-+p.3.jpg (image)". bp.blogspot.com.
  144. Neuman, William (May 18, 2007). "Manhattan: Budget Increases for New Subway". The New York Times. Retrieved May 24, 2007.
  145. Earle, Geoff (April 17, 2006). "Feds Finally Aboard 2nd Avenue $ubway". New York Post. Archived from the original on June 14, 2006. Retrieved June 9, 2013.
  146. Dan Rivoli (April 1, 2014). "Second Avenue Subway progress: Dec. 2016 end date on track". AM New York, Newsday. Retrieved May 4, 2014.
  147. 1 2 "Capital Programs Second Avenue Subway". Metropolitan Transportation Authority.
  148. The Launch Box—Fewer Than 1,000 Days to Go!
  149. Second Avenue Subway Community Board 8 Second Avenue Subway Task Force Update
  150. MTA releases Second Avenue subway images, says project on track Daily News (New York), November 5, 2013
  151. Siff, Andrew (June 18, 2015). "2nd Ave Subway to Open Later Than MTA Expects: Feds". NBC New York. Retrieved 2016-10-20.
  152. 1 2 3 Donohue, Pete (January 20, 2013). "Second Ave. subway on track to open in 2016: MTA". Daily News. New York. Retrieved March 25, 2013.
  153. "MTA Will Tap Into Back-Up Fund to Finish Second Ave. Subway On Time: Board". DNAinfo New York. Retrieved March 6, 2016.
  154. 1 2 Fitzsimmons, Emma G. (2016-10-26). "2 Stations on New 2nd Avenue Line May Not be Ready by December". The New York Times. ISSN 0362-4331. Retrieved 2016-10-27.
  155. Rivoli, Dan (December 15, 2015). "Second Ave. subway may miss December 2016 opening deadline". NY Daily News. Retrieved 2016-10-27.
  156. Krisel, Brendan (October 26, 2016). "Independent Engineer Concerned Again for December Launch of Second Avenue Subway". Upper East Side, NY Patch. Retrieved 2016-10-27.
  157. Fitzsimmons, Emma G. (2016-11-14). "'Unprecedented' Work Required to Open 2nd Avenue Subway by Year's End, Officials Say". The New York Times. ISSN 0362-4331. Retrieved 2016-11-17.
  158. 1 2 "Upper East Side Building Sues MTA Over Planned Subway Entrances". DNA Info. February 17, 2011. Retrieved May 19, 2014.
  159. "Owners and Tenants of Yorkshire Towers Sue to Relocate Planned 86th Street Entrances to Second Avenue Subway". Anderson Kill. February 17, 2011. Archived from the original on May 19, 2014. Retrieved May 19, 2014.
  160. "NIMBY suit opposing 86th St. entrances dismissed". Second Avenue Sagas. June 18, 2013. Retrieved May 19, 2014.
  161. United States District Court for the Southern District of New York86th Street station lawsuit dismissed
  162. 1 2 3 4 Greg B. Smith (June 2, 2013). "Second Avenue subway plagued with dangerous conditions and safety violations". Daily News. New York. Retrieved May 4, 2014.
  163. Luke McKenna (January 27, 2012). "The Second Avenue Subway Project Might Be To Blame For An Obnoxious Cough". Business Insider. Retrieved August 14, 2015.
  164. Christine Haughney (November 23, 2011). "2 Views on Subway Project: Delay Work to Clear Air, or Carry On and Profit Sooner". The New York Times. Retrieved August 14, 2015.
  165. "Air Quality Monitoring Study of the 86th Street Station: Construction on Second Avenue: Interim Report" (PDF). May 15, 2012. Retrieved November 14, 2015. During the monitoring period all monitored concentrations were below the established benchmark levels. The results indicate that PM10 levels were slightly higher on the days of test blasting, however, PM2.5 concentrations did not change.
  166. 1 2 "EXCLUSIVE: Second Avenue subway plagued with dangerous conditions and safety violations". Daily News. New York. Retrieved May 14, 2014.
  167. mta.info—Summary Report of August 21, 2012 Incident at Ancillary No. 2
  168. "Blasting Goes Awry Along 2nd Avenue Subway « CBS New York". Newyork.cbslocal.com. August 21, 2012. Retrieved May 14, 2014.
  169. August 21, 2012 2:36 pm Updated: August 22, 2012 2:25 pm. "Second Avenue Subway Explosion Breaks UES Windows After Workers Use Too Many Explosives (PHOTOS)". The Huffington Post. Retrieved May 14, 2014.
  170. Kathy Carvajal; Arun Kristian Das; Luke Funk. "Second Ave. subway construction blast investigation - New York News". Myfoxny.com. Archived from the original on May 14, 2014. Retrieved May 14, 2014.
  171. Creag, Katherine (March 20, 2013). "Worker Trapped in Mud Beneath MTA Site Rescued After 4 Hours". NBC New York. Retrieved May 15, 2014.
  172. "'The mud just grabbed me and wouldn't release me': Rescued Second Ave. subway worker who spent four hours in cold upper East Side muck recovering". Daily News. New York. Retrieved May 15, 2014.
  173. "MTA subway worker trapped in tunnel rescued". METRO Magazine. Retrieved May 15, 2014.
  174. Most, Doug, The race underground : Boston, New York, and the incredible rivalry that built America’s first subway, First edition, New York : St. Martin’s Press, February 2014. ISBN 9780312591328.
  175. Grynbaum, Michael M. (2011-08-16). "CITY ROOM; On 2nd Avenue, a Halt to Things That Go Kaboom in the Night". The New York Times. ISSN 0362-4331. Retrieved 2016-10-27.
  176. Smith, Greg B., "Concrete certification company American Standard Testing admits it faked safety and inspection reports on thousands of New York City buildings", New York Daily News, December 14, 2012. Retrieved December 14, 2012.
  177. "MTA Capital Program 2015-2019: Renew. Enhance. Expand." (PDF). Metropolitan Transportation Authority. October 28, 2015. Retrieved October 28, 2015.
  178. "Second Avenue Subway 2004 FEIS Figure F-1 125th Street Station Study Area for Potential Easements or Acquisitions" (PDF). mta.info. Metropolitan Transportation Authority. 2004. Retrieved August 7, 2016.
  179. 1 2 "MTA Capital Program 2015 – 2019 Capital Plan Renew. Enhance. Expand. As Approved by MTA Board April 20, 2016. As Approved by the CPRB May 23, 2016." (PDF). mta.info. Metropolitan Transportation Authority. May 2016. Retrieved August 7, 2016.
  180. "Second Avenue Subway Gets $1.5B for Phase 2 Construction". Curbed NY.
  181. Pete Donohue (March 2, 2015). "Second Ave. subway project will be cut short if funding doesn't come through, MTA chief says". Daily News. New York. Retrieved March 24, 2015.
  182. "2nd Phase of Second Avenue Subway Construction Delayed, Frustrating East Harlem Officials and Residents". NBC New York. Retrieved March 6, 2016.
  183. Otis, Ginger Adams (2016-03-04). "MTA getting ready to start Second Avenue Subway Phase 2". Daily News. New York. Retrieved 2016-03-06.
  184. "MTA Prepares to Extend Second Avenue Subway to East Harlem". DNAinfo New York. Retrieved March 6, 2016.
  185. Fitzsimmons, Emma G. (April 20, 2016). "M.T.A. Spending Plan Restores Funding for 2nd Ave. Subway". New York Times. New York. Retrieved May 16, 2016.
  186. "Initial East Harlem Rezoning Plan Promises 30-Story Towers and Less Parking - New York YIMBY". New York YIMBY. 2016-10-19. Retrieved 2016-10-23.
  187. "EAST HARLEM NEIGHBORHOOD STUDY Draft Planning Framework DCP Manhattan Office October 18, 2016" (PDF). www1.nyc.gov. NYC Planning. October 18, 2016. Retrieved October 22, 2016.
  188. "Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS), April 2003 Chapter 2 Project Alternatives" (PDF). mta.info. Metropolitan Transportation Authority. April 2003. Retrieved August 9, 2016.
  189. "Chapter 3: Description of Construction Methods and Activities - Second Avenue Subway SDEIS" (PDF). MTA. Retrieved August 15, 2015.
  190. 1 2 "Second Avenue Subway Construction Techniques" (PDF). mta.info. Metropolitan Transportation Authority. August 2002. Retrieved February 15, 2016.
  191. 1 2 3 4 5 6 Wynne, Alexandra (January 20, 2009). "Fairytale of New York – Second Avenue Subway takes shape". New Civil Engineer. Retrieved August 2, 2009. (subscription required (help)).
  192. "Second Avenue Subway Final Environmental Impact Statement (FEIS), May 2004 Figure 2-6 Deep Chrystie Alignment" (PDF). mta.info. Metropolitan Transportation Authority. May 2004. Retrieved August 7, 2016.
  193. Hession, Michael (May 2, 2014). "A Subterranean Stroll Through NYC's Newest Train Tunnel". Gizmodo. Retrieved May 13, 2014.
  194. Rivoli, Dan (May 1, 2014). "Second Avenue Subway progress: Dec. 2016 end date on track". AM New York. Retrieved May 14, 2014.
  195. Kanno-Youngs, Zolan (2016-06-19). "Sneaking a Peek at the Second Avenue Subway Line". WSJ. Retrieved 2016-06-20.
  196. 1 2 3 4 5 6 7 8 9 10 11 "Final Summary Report" (PDF). Metropolitan Transportation Authority. October 11, 2001. Retrieved April 10, 2014.
  197. 1 2 3 4 5 6 7 8 9 "Making the Case" (PDF). Federal Transit Administration. August 20, 2004. Archived from the original (PDF) on February 27, 2013. Retrieved April 10, 2014.
  198. 1 2 "Ahead of 2nd Ave. Subway opening, MTA officially set to restore W service to Astoria". Second Ave. Sagas. Retrieved 2016-02-19.
  199. 1 2 "MTA Confirms W Train is Coming Back". TWC News. Retrieved 2016-02-19.
  200. "Longer waiting time expected for Second Ave. subway line". NY Daily News. Retrieved 2016-05-26.
  201. "MTA Board to approve W train resurrection as 2nd Ave. Subway operations come into view". Second Ave. Sagas. 2016-05-23. Retrieved 2016-05-26.
  202. "SUB-DIVISION B TRAIN OPERATOR/CONDUCTOR ROAD & NON-ROAD WORK PROGRAMS IN EFFECT: NOVEMBER 6, 2016" (PDF). progressiveaction.info. New York City Transit. July 29, 2016. Retrieved August 19, 2016.
  203. Hirschman, David (August 2008). "The T Train: NYC Will Get Its First New Subway Line in 70 Years". Wired (Aug '08): 36. Archived from the original on July 25, 2008. Retrieved April 8, 2014. The old (1960s) T service was also called the West End train. The reference was to Brooklyn. By contrast, the new T service will serve the East Side of Manhattan, and 'will unite the Upper and Lower East Sides.'
  204. "MTA Advances Work On Second Avenue Subway Service" (Press release). Metropolitan Transportation Authority. Retrieved 2016-02-19.
  205. 1 2 3 Reeves, Hope (October 26, 2006). "The Second Avenue Subway Is Brought to You by the Letter T". New York. Retrieved August 2, 2009.
  206. 1 2 "V and W trains join a long list of routes that have bowed out of the subways - am New York". June 20, 2010. Archived from the original on June 20, 2010. Retrieved 2016-10-23.

External links

Route map: Bing / Google

KML is from Wikidata
Wikimedia Commons has media related to IND Second Avenue Line.
This article is issued from Wikipedia - version of the 12/2/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.