Tennessee Gas Pipeline

Tennessee Gas Pipeline
Location
Country United States
General direction North-east
From Texas-Louisiana Gulf coast
To New England
General information
Type Natural gas
Owner Kinder Morgan
Contractors TGT
Commissioned 1943
Technical information
Length 11,900 mi (19,200 km)
Diameter 32 in (813 mm)

Tennessee Gas Pipeline (TGPL) is a set of natural gas pipelines that run from the Texas and Louisiana coast through Arkansas, Mississippi, Alabama, Tennessee, Kentucky, Ohio and Pennsylvania to deliver natural gas in West Virginia, New Jersey, New York and New England. The 11,900-mile (19,200 km) long system is operated by the Tennessee Gas Pipeline Company, a subsidiary of Kinder Morgan.[1] It is one of the largest pipeline systems in the United States. Its FERC code is 9.[2] TGP's PHMSA pipeline operator i.d. is 19160.[3]

History

The first pipeline was constructed by Tennessee Gas Transmission Company (TGT) beginning in 1943. TGT-owner Tenneco eventually sold off this pipeline to El Paso Corporation which held it until 2012, selling it to Kinder Morgan.

Expansion projects

In 2014, Kinder Morgan proposed Northeast Energy Direct Project (NED), a new branch with 117 miles (188 km) of greenfield pipeline from Pennsylvania to Wright, New York and 129 miles (208 km) of greenfield pipeline to Dracut, Massachusetts.[4] The Kinder Morgan proposal met with immediate resistance from local and state officials, conservation organizations and more than twenty Massachusetts towns that the proposed pipeline would cross.[5] Public and environmental safety was the primary concern, due to TGP's history of pipeline accidents. The pipeline route was heavily debated amid widespread refusal of Kinder Morgan's requests to survey the route. The area is heavily wooded in some areas and contains "sensitive eco-systems including conservation lands, wildlife reserves, state parks as well as farmland, towns and even crossing over or under the Connecticut River."[5]

KM proposed that "approximately 91% of the NED Market Path Component would be co-located along existing utility corridors/adjacent to TGP mainline. The total project (both Supply and Market Path Components) would be 82% co-located."[4] An alternative would be to follow the Massachusetts Turnpike highway system from western Massachusetts into Boston. This would reduce the environmental impact, while allowing natural gas to be transported.

Supporters claimed that the pipeline would have positive impacts. "The pipeline is not only a pipeline for natural gas, but it is a pipeline for new construction and jobs."[6] KM claimed, "NED helps sustain electric grids, reduce emissions, lower energy costs and spur economic growth region-wide."[4] The new pipeline would "bring up to 2.2 billion cubic feet per day (62×10^6 m3/d) of natural gas from the Marcellus shale fields to New England and Canadian markets."[7] The planned pipeline was roughly 350 miles (560 km) long and would be 36 inches (910 mm) in diameter. The design would include "large, powerful compressor stations."[7]

Incidents

From 2006 to 2014, TGP had 92 "significant incidents" with their pipelines, resulting in $88,144,152 in property damage and 19 federal enforcement actions.[8][9]

A "significant incident" results in any of the following consequences:

From 2006 to 2013, federal inspectors were onsite at TGP locations for 383 days (more than a year) plus 98 days of accident investigations.[11]

PHMSA failure reports from 20032012 include 45 TGP failures that caused $110,563,378 in property damage.

Overall, faulty infrastructure caused the majority of TGP's onshore gas transmission pipeline accidents. Corrosion (internal or external), equipment malfunctions, manufacturing defects, faulty welds and incorrect installation together accounted for 54% of leaks.[12]

Failures may be escalating due to pipeline age.[3]

On March 4, 1965, a 32-inch (810 mm) diameter TGPL gas transmission pipeline explosion, north of Natchitoches, Louisiana, killed 17 people, the deadliest gas transmission pipeline accident in U.S. history. This explosion and others of the era, led to PHMSA's formation in 1967.[13]

Other TGP pipeline failures (leaks and explosions) occurred on January 13, 2004, March 23, 2005, December 29, 2005, on May 19, 2006, on July 22, 2006, on February 17, 2007, on September 2008,[12] on November 20, 2010[14], on December 8, 2010[15], on February 10, 2011, on March 1, 2011[16], on November 16, 2011[17][18], on November 21, 2011[19], on January 14, 2012[20], on January 24, 2014[21] and on July 23, 1980.[22]

References

  1. "Tennessee Gas Pipeline". Retrieved 2015-06-27.
  2. "FERC: Natural Gas - Pipeline Code List". Retrieved 2010-10-10.
  3. 1 2 "PHMSA: Stakeholder Communications - Operator Information".
  4. 1 2 3 Kinder Morgan NED web page Archived August 12, 2014, at the Wayback Machine.
  5. 1 2 "No Fracked Gas In Mass!".
  6. Mass, Isaac. "Mass/My Turn: Case for the Pipeline." The Recorder. N.p., n.d. Web. 26 June 2015.
  7. 1 2 Mary Serreze | Special to The Republican. "Gas Pipeline Foes Form Three-state Coalition to Fight Kinder Morgan's Northeast Energy Direct Project." N.p., n.d. Web. 26 June 2015
  8. U.S. DOT Pipeline & Hazardous Materials Safety Administration (PHMSA), sources cited below.
  9. "PHMSA: Stakeholder Communications - Operator Information".
  10. PHMSA Pipeline Operator Reports, accessed June 20–22, 2014.
  11. "PHMSA: Stakeholder Communications - Operator Information".
  12. 1 2 PHMSA Failure reports
  13. "Natchitoches, LA Gas Pipeline Explosion, Mar 1965 - GenDisasters ... Genealogy in Tragedy, Disasters, Fires, Floods".
    "Daytona Beach Morning Journal - Google News Archive Search".
    "The Press-Courier - Google News Archive Search".
    "The Washington Observer - Google News Archive Search".
  14. Letter from R. M. Seelye, Director, PHMSA Southwest Region
  15. "Why Do Gas Pipelines Fail", accessed 6/26/2014.
  16. "Pipeline failure caused huge Morgan County blast" Columbus Dispatch, November 17, 2011>
  17. "Archived copy". Archived from the original on 2012-03-25. Retrieved 2013-04-02.
    "Pipeline failure caused huge Morgan County blast", Columbus Dispatch, November 17, 2011
    "Pipeline failure caused huge Morgan County blast".
  18. "Pipeline failure caused huge Morgan County blast".
  19. PHMSA report at ;
  20. "Archived copy". Archived from the original on 2012-01-19. Retrieved 2012-05-14.
  21. “Texas Significant Incidents Listing, 2003-2014, PHMSA Pipeline Safety Stakeholder Communication, U.S. DOT, accessed June 17, 2014.
  22. PHMSA enforcement data, case CPF 220061007H.

External links