Réseau Ferroviaire Rapide

Phase 1
Legend
Bizerte
Djedeida
Bejaoua
Gobaâ
Cité des orangers
Manouba
Elbortal
Bardo
Erraouda
Mellacine
Tunis Barcelone station
Ennajeh
Ettarayane - Ezzouhour
Ezzouhour 2
Haraïra
Cité Bougatfa - Sidi Hassine

The Réseau Ferroviaire Rapide is a planned urban rail system in Tunis, in Tunisia.

Network

In Phase I of the project, a 17.9-kilometre long (11.1 mi), Y-shaped network will be built, with 14 stations.[1] Both lines will terminate at a station at place de Barcelone; Line D will run to Gobaâ and Line E will run to Bougatfa. These lines should begin service in December 2015.[2]

Longer term plans call for five lines, to build an 85-kilometre long (53 mi) network centred on Tunis.[3][4]

Project

Tenders for construction were opened in March 2008.[5] The cost of phase 1 is estimated at د.ت 1,000,000,000 dinars.[6][7]

See also

Website

References

This article is issued from Wikipedia - version of the 10/15/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.