Niantic station

East Lyme and Niantic

Niantic station in 1915
Location Niantic, Connecticut
Line(s)
  Shore Line East (proposed)
Tracks 2
Construction
Disabled access No (Amtrak)
Yes (SLE)
History
Opened Pre-1915 (NYNH&H)
Closed 28 January 1972 (Amtrak)[1][2]
Electrified 25,000V (AC) overhead catenary
Previous names East Lyme
East Lyme and Niantic
Services
  Former services  
Amtrak
toward New Haven
Clamdigger
Closed 1971
Terminus
toward New Haven
Beacon Hill
1978-1981
  Proposed services  
Preceding station   ConnDOT   Following station
toward Stamford
Shore Line East
Terminus

Niantic (also known as East Lyme or East Lyme and Niantic) was a train station on the Northeast Corridor (NEC), located in Niantic, Connecticut, which served intercity and commuter rail trains until July 1971 (the last of these being the first iteration of Penn Central's—and later Amtrak's—Clamdigger commuter service); a new station has since been proposed to be built in Niantic to serve the Shore Line East commuter rail line.[2][3]

Former stations

Niantic was a stop on the New York, New Haven and Hartford Railroad (NYNH&H)'s New Haven-New London commuter train (named the Clamdigger during the Great Depression) from its inception in 1898.[4] At some point before 1915, a wooden train station was built in Niantic at the intersection of Pennsylvania Avenue and the NYNH&H's Shore Line; the original station was destroyed by the 1938 New England hurricane, but trains continued to stop at Niantic.[2] The NYNH&H was taken over by Penn Central at the end of 1968; after 30 April 1971, Penn Central continued to run the Clamdigger under contract to Amtrak.[5] By this point, Niantic station was known as East Lyme and Niantic.[5] In January 1972, citing increasing losses, Amtrak discontinued the Clamdigger.[1][6][7]

In 1975, the Connecticut Department of Transportation (CDOT) made plans to restore commuter rail service between New Haven and New London, with a twice-daily Clamdigger making the same stops as the pre-1972 train, including to the former Niantic station (now to be named simply East Lyme); although negotiations with Penn Central were successful, budgetary constraints prevented these plans from coming to fruition.[8] Although Amtrak restored the Clamdigger in 1976-1977, and again briefly from January-April 1978, neither service stopped at East Lyme/Niantic.[9][10] However, the 1978 iteration of the Clamdigger was replaced effective 30 April of that year with the Beacon Hill between New Haven and Boston South Station, which did serve a station at East Lyme.[11] Service to East Lyme/Niantic ended for the final time in October 1981, when the Beacon Hill was discontinued amid cuts to Amtrak's budget.[12]

Proposed return of service

In 1981 and 1986, bills were introduced in the Connecticut General Assembly proposing a restoration of commuter rail service between New Haven and New London.[8] The 1986 bill prompted a study analysing the feasibility of a restored commuter rail line along this route; due primarily to heavy congestion on the adjacent segments of Interstate 95, such a service was deemed feasible, and Shore Line East (SLE) service began between New Haven and Old Saybrook stations on 29 May 1990.[8] Beginning in 1996, some SLE trips were extended eastward to New London, and further increases in service to the latter station took place in 2010 and 2013; however, they did not make any stops between Old Saybrook and New London.[8][13][14][15][16][17]

In April 2012, a state report was released detailing four possible sites for an infill station in East Lyme. Two of the sites were near downtown Niantic, while the other two were in Rocky Neck State Park.[2] A 2015 bonding proposal from Connecticut governor Dannel Malloy allocated $750,000 to the planning and construction of a new station and parking lot in Niantic (out of an estimated $30,000,000 required to bring the new station fully into service).[3]

References

  1. 1 2 "Last Run Made By 'Clamdigger'". Bridgeport Telegram. January 29, 1972. p. 32. Retrieved July 13, 2016 via Newspapers.com.
  2. 1 2 3 4 Reindl, JC (6 April 2012). "Niantic could be stop for railroad". The New London Day. Retrieved 13 July 2016.
  3. 1 2 Drelich, Kimberly (18 February 2015). "$750,000 would go toward Niantic train station plan". The New London Day. Retrieved 13 July 2016.
  4. Bagwell, Mike (20 December 1971). "Commuters work to save Clamdigger". The New London Day. Retrieved 13 July 2016.
  5. 1 2 National Railroad Passenger Corporation (Amtrak) (1 May 1971). "Nationwide Schedules of Intercity Passenger Service". The Museum of Railway Timetables. p. 6. Retrieved 11 October 2012.
  6. Killian, Robert A.; et al. (19 January 1972). "WOOD v. NATIONAL RAILROAD PASSENGER CORP.". 341 F.Supp. 908 (1972). Retrieved 13 July 2016.
  7. "Sabotaging the Clamdigger (editorial)". The New London Day. 30 December 1971. Retrieved 11 October 2012.
  8. 1 2 3 4 "Final Report of the Task Force on Rail Service". Connecticut General Assembly Office of Legislative Research. February 1996. Retrieved 11 October 2012.
  9. National Railroad Passenger Corporation (Amtrak) (October 31, 1976). "National Train Timetables". The Museum of Railway Timetables. pp. 15,22. Retrieved 14 July 2016.
  10. National Railroad Passenger Corporation (Amtrak) (8 January 1978). "National Train Timetables". The Museum of Railway Timetables. p. 9. Retrieved 11 October 2012.
  11. National Railroad Passenger Corporation (Amtrak) (1 October 1979). "National Train Timetables". The Museum of Railway Timetables. p. 15. Retrieved 14 July 2016.
  12. Hebert, H. Josef (August 26, 1981). "New Amtrak Network Keeps Most of System Intact". Associated Press. Retrieved 2008-05-04.
  13. "Shore Line East". Trains. July 5, 2006. Retrieved 15 July 2016.
  14. Edgecomb, Kathleen (4 February 2010). "Rell: NL to get second daily commuter train". The Day. Retrieved 15 July 2016.
  15. "ALL aboard the Shore Line East!". The Day. 4 February 2010. Retrieved 9 May 2010.
  16. "Shore Line East Steaming Into New London". Hartford Courant. 6 July 2012. Retrieved 15 July 2016.
  17. Smith, Greg (17 May 2013). "Shore Line East expands train service". The Day. Retrieved 15 July 2016.
This article is issued from Wikipedia - version of the 10/8/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.