Firestone hydroelectric power station
Firestone Hydroelectric Project | |
---|---|
Location | Harbel, Margibi County, Liberia |
Status | Active |
Commission date | 1942 |
Owner(s) | Firestone Plantations Company |
Thermal power station | |
Primary fuel | Hydropower |
Power generation | |
Units operational | 4 |
Nameplate capacity | 4.8 MW (6,400 hp) |
The Firestone hydroelectric power station is a hydroelectric power station in Liberia on the Farmington River. Built in 1942, it was the first power generating dam built in the country.[1] Located in Harbel, Margibi County, it is operated by the Firestone Plantations Company.[1]
Capacity
The project has a generating capacity of 4.8 megawatts (6,400 hp) produced by four turbines, and annual output of 1.6x103 kilowatts (138 hp) hours.[1] Initial construction was in order to supply power to a United States military facility in the area during World War II and to supply the city of Robertsfield.[1] The plant was the only hydro power facility to remain intact during the Civil Wars.[2]
References
- 1 2 3 4 First State of the Environment Report for Liberia – 2006. United Nations Development Programme. 2006, p. 44-45. Retrieved on October 19, 2008.
- ↑ Osterkorn, Marianne (April 17, 2008). "Liberia Finds Role for renewables". REEEP. Retrieved 2008-10-26.
Coordinates: 6°17′51″N 10°18′08″W / 6.29750°N 10.30222°W
This article is issued from Wikipedia - version of the 2/18/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.