Eastern Alberta Transmission Line

Eastern Alberta Transmission Line is a 485 km long, 500 kV, bipolar, high-voltage direct current, overhead transmission line interconnecting Newell HVDC static inverter plant near Brooks, Alberta with Heathfield static inverter plant near Gibbons, Alberta - northeast of Edmonton.[1] The transmission line includes 1387 transmission towers and the construction of the 500kV DC transmission line is completed since december 2014 at a total cost of C$1.8 billion. Work continues on the EATL converter stations. [2] The project is the first newly built, long-distance, HVDC line in Canada since the completion of the Quebec – New England Transmission Project, and is owned by ATCO Electric, being built by Siemens. See also Western Alberta Transmission Line (WATL).

References

  1. "Project Details". ATCO Electric. 2013. Retrieved 2014-08-05.
  2. "Eastern Alberta Transmission Line". ATCO Electric. 2013. Retrieved 2014-08-05.
This article is issued from Wikipedia - version of the 8/10/2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.