Downtown West – Kerby

Downtown West – Kerby
C-Train station
Location 11 Street & 7 Avenue SW
Coordinates 51°02′49.8″N 114°05′14.34″W / 51.047167°N 114.0873167°W / 51.047167; -114.0873167Coordinates: 51°02′49.8″N 114°05′14.34″W / 51.047167°N 114.0873167°W / 51.047167; -114.0873167
Owned by Calgary Transit
Line(s) 7th Avenue Transit Corridor
Platforms Side-loading platforms
Construction
Structure type At-Grade
Disabled access Yes
History
Opened 2012
Services
Preceding station   CTrain   Following station
Route 202
westbound
toward Saddletowne
eastbound
toward Saddletowne

Downtown West – Kerby is a CTrain free-fare zone station on the 7 Avenue transit-only corridor in Calgary, Alberta.[1] Unlike all the other downtown stations, this gateway station[2] is exclusively for Route 202 West LRT line, which opened for revenue service on December 10, 2012.[3][4][5][6] The preview for the public occurred on December 8, 2012.

This station replaces the former centre-loading 10 Street SW platform and relocated one block to the west. Initially, the name of this new dual side-loading platform was to be just 11 Street SW. However, Calgary City Hall changed the name to its present form because of the history of the Kerby family name in this location and the proximity to the Kerby Centre (a major social services centre primarily for seniors). The only other two-platform station in downtown is the City Hall station at the eastern end of the 7 Avenue SW transit mall. As part of the Calgary Transit Seventh Avenue refurbishment project[7] Downtown West-Kerby has been built to accommodate 4-car consists.

This station serves mainly the Downtown West End community, both residential and businesses.

Notable places nearby

References

  1. "7 AVENUE REFURBISHMENT PROJECT UPDATE: DOWNTOWN WEST-KERBY STATION" (PDF). The City of Calgary (website). Retrieved 2012-09-15.
  2. "Luminous Crossings - Public Artwork". City of Calgary.
  3. "7 AVENUE REFURBISHMENT PHASE 2 PROJECT UPDATE – SEPTEMBER 24, 2012" (PDF). The City of Calgary. September 24, 2012. Retrieved 2012-09-26.
  4. "7 AVENUE REFURBISHMENT PHASE 2 PROJECT UPDATE – OCTOBER 8, 2012" (PDF). The City of Calgary. October 8, 2012. Retrieved 2012-10-12.
  5. Potkins, Meghan (November 7, 2012). "West LRT line will open Dec. 10 on time, city says". Calgary Herald. Retrieved 2012-11-07.
  6. West LRT Infographic (YouTube)
  7. "(untitled)". City of Calgary. Archived from the original on October 17, 2012.


This article is issued from Wikipedia - version of the 11/29/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.