Alameda and San Joaquin Railroad

Alameda and San Joaquin Railroad
Locale Tracy, California
Dates of operation 18951903
Track gauge 4 ft 8 12 in (1,435 mm) standard gauge
Headquarters Stockton, California

The Alameda and San Joaquin Railroad was incorporated on May 1, 1895 to serve the coal mines of the San Francisco & San Joaquin Coal Company at Corral Hollow. The 36.6-mile (58.9 km) line ran from Tesla (located in the Corral Hollow canyon southeast of Corral Hollow Pass) to Carbona just south of Tracy and then up to Lathrop and Stockton. The line was constructed in 1895. On July 25, 1903 the line was sold to the Western Pacific Railway (WP).

Route

The line from Tesla - Carbona was abandoned by the WP in January 1916, however an April 1916 timetable continued to show that line.

The remainder of the line from Carbona to Stockton became the WP's mainline (today's Union Pacific) route from Tracy to Stockton.

References

This article is issued from Wikipedia - version of the 6/17/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.